Skip to content
The text

North Carolina S 730, Amended: Ratepayer Protection Act

The text Dorworth News extracted from the kept copy

Download the original (PDF, 120 KB)

Fingerprint
ad50f4094ca5498c57aa5b3a6238b66a0a7476315699160f7a1270bb446d0fc3SHA-256 of the kept copy exactly as received.
Original
https://www.ncleg.gov/Sessions/2025/Bills/Senate/PDF/S730v2.pdf
The text
8 paragraphs, read from the kept copy, kept . The words are the document’s own; the layout is the site’s. Its words are read line by line across each page; columns, tables and pictures are not kept here.
1

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2025

2

S 2 SENATE BILL 730 Second Edition Engrossed 5/7/25

3

Short Title: Expand CEPS/Nuclear and Hydro. (Public)

4

Sponsors: Senator Jarvis (Primary Sponsor).

5

Referred to: Rules and Operations of the Senate

6

March 26, 2025

7

1 A BILL TO BE ENTITLED 2 AN ACT TO EXPAND THE CLEAN ENERGY PORTFOLIO STANDARD TO INCLUDE 3 EXISTING NUCLEAR AND LARGE HYDROELECTRIC POWER FACILITIES. 4 The General Assembly of North Carolina enacts: 5 SECTION 1. G.S. 62-133.8 reads as rewritten: 6 "§ 62-133.8. Clean Energy and Energy Efficiency Portfolio Standard (CEPS). 7 (a) Definitions. – As used in this section: 8 … 9 (4c) "New clean energy facility" means: 10 a. A new renewable energy facility; or 11 b. Facilities placed into service on or after January 1, 2007, which that 12 are either (i) a nuclear energy facility, including an uprate to a nuclear 13 energy facility, or (ii) a fusion energy facility. 14 (5) "New renewable energy facility" means a renewable energy facility that 15 either: 16 a. Was placed into service on or after January 1, 2007. 17 b. Delivers or has delivered electric power to an electric power supplier 18 pursuant to a contract with NC GreenPower Corporation that was 19 entered into prior to January 1, 2007. 20 c. Is a hydroelectric power facility. facility with a generation capacity of 21 10 megawatts or less that delivers electric power to an electric power 22 supplier. 23 … 24 (7) "Renewable energy facility" means a facility facility, other than a 25 hydroelectric power facility with a generation capacity of more than 10 26 megawatts, that either: 27 …." 28 SECTION 2. This act is effective when it becomes law.

8

*S730-v-2*