Government Accountability Office: Immigration Detention: ICE Should Determine Cost Effectiveness of New Initiatives Before Continuing

The text Dorworth News extracted from the kept copy

Download the original (PDF, 6.4 MB)

Fingerprint
c83e716e131743764e491ef871513e72cac2925b33c4b8e71df621d8efc6bf07SHA-256 of the kept copy exactly as received.
Original
https://www.gao.gov/assets/gao-27-108665.pdf
The text
478 paragraphs, read from the kept copy, kept . The words are the document’s own; the layout is the site’s. Its words are read line by line across each page; columns, tables and pictures are not kept here.
1

United States Government Accountability Office Report to Congressional Requesters

2

November 2026 IMMIGRATION DETENTION

3

ICE Should Determine Cost Effectiveness of New Initiatives Before Continuing

4

GAO-27-108665

Page 2 of the original

5

Immigration Detention

6

Highlights ICE Should Determine Cost Effectiveness of New Initiatives Before Continuing GAO-27-108665 November 2026

7

A report to congressional requesters

8

For more information, contact: Heather MacLeod at MacLeodH@gao.gov

9

What GAO Found Why GAO Did This Study Within the Department of Homeland Security (DHS), U.S. Immigration and A January 2025 Executive Order Customs Enforcement (ICE) received $45 billion in immigration detention funding directed DHS to increase efforts to in July 2025 through Public Law 119-21, commonly known as the One Big detain individuals apprehended for Beautiful Bill Act, available through fiscal year 2029. In addition to maintaining violations of immigration law and to existing facilities with these funds, ICE began implementing an initiative to buy allocate all available resources for ICE detention. ICE received significant and renovate a collection of warehouses to use as new detention facilities. funding in July 2025 to operate and However, after acquiring 11 warehouses for about $1.07 billion, ICE scaled down expand detention facilities. the initiative significantly and plans to sell seven of them. In July and August 2026, ICE also bought four existing detention facilities for about $2.2 billion total. GAO was asked to review the costs of However, the scope, time frames, and estimated costs for further acquisitions ICE’s detention facilities. This report remain undetermined. In addition, ICE did not update its spending plan for examines (1) the extent to which ICE detention funding to reflect the shifting status of the warehouse initiative or other has planned to use available funds to planned acquisitions, as required by its internal guidance. As a result, the expand detention capacity; (2) the costs spending plan includes an inflated estimate of planned obligations, which affects of detention facilities over time and by oversight efforts and ICE’s ability to assess long-term budget needs. facility type; and (3) the extent to which ICE has developed processes and Examples of U.S. Immigration and Customs Enforcement Warehouse Facilities procedures for managing and overseeing these costs.

10

GAO reviewed documentation on detention expansion efforts, agency spending plans, and facility costs from October 2022 through various points in 2026. GAO interviewed headquarters and field officials at four ICE field offices, including site visits to multiple existing and planned detention facilities. GAO selected these locations, in part, because they were the sites of multiple detention expansion efforts. GAO reviewed available cost estimates and

11

ICE obligated about $2.8 billion for detention in fiscal year 2025, an increase of compared spending plans to ICE about 41 percent from the prior year, amid expanded enforcement activity. Daily guidance. GAO also analyzed costs per detained noncitizen varied by facility type. The nine Federal Bureau of information on the Department of Prisons facilities ICE used charged a median daily rate of $180 per noncitizen, Defense’s and Federal Emergency Management Agency’s costs for the highest of any facility type. Privately operated facilities had a median rate of supporting immigration detention. $151, while those operated through agreements with the U.S. Marshals Service or state and local governments ranged from $85 to $103. ICE officials said that What GAO Recommends services provided, detention standards used, and location also influence rates. GAO is making two recommendations, ICE employs various processes to manage and oversee facility costs, but some that ICE update its spending plan for were affected by the rapid expansion of new facilities. For example, the workload detention funding in accordance with of staff who provide oversight and validate invoices for these facilities increased internal guidance, and develop life-cycle significantly, and ICE is working to fill 55 of the 87 allocated positions nationwide. cost estimates, in coordination with Further, ICE did not manage detention facility investments in accordance with DHS, before making new detention DHS acquisition practices, which include the development of life-cycle cost investments. DHS concurred with these estimates. Developing such estimates before making further acquisitions would recommendations. position ICE to better assess these investments, reduce potential waste, and help ensure the cost effective use of taxpayer dollars.

12

United States Government Accountability Office

Page 3 of the original

13

Contents

14

Letter 1

15

Background 3 Funding for ICE Detention Increased Sharply in 2025, but Spending Plan Remains Undefined 6 Detention Expansion Is Correlated with Higher-Cost Bedspace 17 ICE Employs Various Cost Management and Oversight Processes, but Did Not Fully Assess Cost Effectiveness Amidst Facility Expansion 31 Conclusions 37 Recommendations for Executive Action 38 Agency Comments and Our Evaluation 38

16

Appendix I Objectives, Scope and Methodology 42

17

Appendix II Data on U.S. Immigration and Customs Enforcement (ICE) Ground Transportation Costs 48

18

Appendix III Federal Emergency Management Agency (FEMA) Grant Supporting Immigration Detention in Florida 49

19

Appendix IV Data on the Department of Defense’s (DOD) Costs for Supporting Immigration Detention 52

20

Appendix V Additional Information on U.S. Immigration and Customs Enforcement (ICE) Warehouse Properties 55

21

Appendix VI Delays in Paying Detention Facility Operators and Associated Interest Penalties 57

22

Page i GAO-27-108665 Immigration Detention

Page 4 of the original

23

Appendix VII Comments From the Department of Homeland Security 59

24

Appendix VIII Contacts and Staff Acknowledgments 64

25

Tables

26

Table 1: Summary of U.S. Immigration and Customs Enforcement (ICE) Detention Facilities, as of June 2026 5 Table 2: Warehouse Facilities Purchased by U.S. Immigration and Customs Enforcement (ICE) as of March 2026 11 Table 3: U.S. Immigration and Customs Enforcement (ICE) Guaranteed Payments and Average Daily Populations at Five Recently Acquired Facilities, April 2026 24 Table 4: Detained Populations and Obligations at Guantanamo Bay, Fiscal Years 2025 and 2026 28 Table 5: Criminality of Detained Population at Guantanamo Bay Camp Six, August 2025 – April 2026 29 Table 6: U.S. Immigration and Customs Enforcement (ICE) Enforcement and Removal Operations Ground Transportation Obligations, October 1, 2022 – July 31, 202648 Table 7: Department of Defense (DOD) Obligations for U.S. Immigration and Customs Enforcement (ICE) Support Activities, Fiscal Years 2025 and 2026 54 Table 8: Assessed Values and Prices of 11 Warehouses Purchased by U.S. Immigration and Customs Enforcement (ICE) 55 Table 9: Interest Penalties Paid on Late Invoices for Immigration and Customs Enforcement (ICE) Enforcement and Removal Activities, October 2022 Through December 202557

27

Figures

28

Figure 1: U.S. Immigration and Customs Enforcement (ICE) Immigration Detention Funding, Fiscal Year 2023-2026 7 Figure 2: Examples of U.S. Immigration and Customs Enforcement (ICE) Warehouse Facilities 10

29

Page ii GAO-27-108665 Immigration Detention

Page 5 of the original

30

Figure 3: Timeline of U.S. Immigration and Customs Enforcement (ICE) Warehouse Detention Initiative, January – June 2026 14 Figure 4: Immigration and Customs Enforcement (ICE) Detention Facility Obligations and Average Daily Population from October 2022 Through June 2026 18 Figure 5: Average Annual Obligations and Daily Population in Adult U.S. Immigration and Customs Enforcement (ICE) Detention Facilities by Type, Fiscal Year 2025 19 Figure 6: U.S. Immigration and Customs Enforcement (ICE) Adult Detention Bed Rates by Facility Type, April 2026 20 Figure 7: Key Steps in the U.S. Immigration and Customs Enforcement (ICE) Detention Facility Invoice Validation Process 33 Figure 8: Detention Operations at the Florida Soft-Sided Facility 49

31

Abbreviations

32

COR contracting officer’s representative DOD Department of Defense DHS Department of Homeland Security ERO Enforcement and Removal Operations BOP Federal Bureau of Prisons FEMA Federal Emergency Management Agency IGSA intergovernmental service agreement OBBBA One Big Beautiful Bill Act OMB Office of Management and Budget ICE U.S. Immigration and Customs Enforcement

33

This is a work of the U.S. government and is not subject to copyright protection in the United States. The published product may be reproduced and distributed in its entirety without further permission from GAO. However, because this work may contain copyrighted images or other material, permission from the copyright holder may be necessary if you wish to reproduce this material separately.

34

Page iii GAO-27-108665 Immigration Detention

Page 6 of the original

35

Letter

36

441 G St. N.W. Washington, DC 20548

37

November 19, 2026

38

Congressional Requesters

39

Within the Department of Homeland Security (DHS), U.S. Immigration and Customs Enforcement (ICE) is the lead agency responsible for providing safe, secure, and humane confinement for detained noncitizens in the United States.1 A January 2025 Executive Order directed DHS to detain individuals apprehended for violations of immigration law to the extent permitted by law, and to allocate all available resources for ICE detention purposes.2 As a result, DHS allocated significant resources to expand and operate facilities for ICE detention. In July 2025, Public Law 119-21, commonly known as the One Big Beautiful Bill Act (OBBBA) provided ICE with $45 billion to detain single adults and families through fiscal year 2029.3 Then in June 2026, the Secure America Act provided ICE with over $31 billion for various activities—including immigration enforcement functions—through fiscal year 2029.4 As a result, DHS pursued various initiatives to significantly expand its immigration detention capacity.

40

We have previously reported on concerns with how ICE plans and oversees its spending, as well as how it manages facility costs and

41

16 U.S.C. § 252 (establishing U.S. Immigration and Customs Enforcement within DHS); 8 U.S.C. § 1103 (powers and duties of the Secretary of Homeland Security). The Immigration and Nationality Act, as amended, provides DHS with broad statutory discretion (subject to certain legal standards) to detain or conditionally release noncitizens depending on the circumstances and statutory basis for detention. See 8 U.S.C. §§ 1226(a), 1231(a)(6), (g)(1) (Secretary shall arrange for appropriate places of detention for aliens detained pending removal or a decision on removal); 8 C.F.R. pts. 236, 241. For readability, we generally use the term “noncitizen,” to refer to an “alien,” (defined under U.S. immigration law as any person who is not a U.S. citizen or national), except when quoting language which includes the term “alien” in statute, regulation, or executive orders. In our audit work, we have found that DHS documentation often uses various terms such as “alien,” “migrant,” and “noncitizen,” among other words or phrases, in reference to those of non-U.S. nationality.

42

2Protecting the American People Against Invasion, Exec. Order No. 14159, 90 Fed. Reg. 8443 (Jan. 29, 2025) (issued Jan. 20).

43

3An Act to provide for reconciliation pursuant to title II of H. Con. Res. 14, Pub. L. No. 119- 21, title IX, subtitle A, § 90003, 139 Stat. 72, 358.

44

4Pub. L. No. 119-98, title II, § 202, 140 Stat. 837, 839.

45

Page 1 GAO-27-108665 Immigration Detention

Page 7 of the original

46

usage.5 ICE data show that the average daily number of individuals in detention increased from 39,314 on January 20, 2025, to 67,180 on July 30, 2026, emphasizing the importance of ICE’s management of costs for housing this increased population.

47

You asked us to review issues related to ICE’s detention facility costs. Specifically, this report examines

48

1. the extent to which ICE has planned to use available funds to expand detention capacity,

49

2. the costs of immigration detention facilities over time and by facility type,

50

3. the extent to which ICE has developed processes and procedures for managing and overseeing facility costs.

51

To examine the extent to which ICE planned to use available funds, we reviewed agency program execution reports and relevant statutes that appropriated funding to ICE for fiscal years 2025 and 2026. We also evaluated ICE’s spending plans for OBBBA funds to determine the extent to which they adhered to ICE guidance for developing those plans. Further, we interviewed ICE budget and program officials to obtain information regarding the planned use of available detention funding, as well as their processes for developing or updating spending plans.

52

To describe the costs of immigration detention facilities, we analyzed ICE data on annual obligations by facility, daily bed rates by facility, and annual obligations for ground transportation of detained noncitizens from October 2022 (the beginning of fiscal year 2023) through various points in 2026. We selected this period to compare the costs of the expansion in detention space, which began in January 2025, against the prior 2 fiscal years. In addition, we analyzed data on Department of Defense (DOD) obligations for supporting ICE detention from October 2024 through May

53

5GAO, Immigration Detention: Urgent Planning Needed to Avoid Further Waste of Taxpayer Dollars, GAO-26-108663, (Washington, D.C.: Sept. 24, 2026); Immigration Detention: Waste and Performance Issues at Camp East Montana Provide Valuable Lessons Learned for Future Facilities, GAO-26-108886, (Washington, D.C.: June 9, 2026). Financial Management: Additional Steps Needed to Improve ICE’s Budget Projections and Execution, GAO-24-106550 (Washington, D.C.: May 15, 2024); Immigration Detention: Actions Needed to Improve Planning, Documentation, and Oversight of Detention Facility Contracts, GAO-21-149 (Washington, D.C.: Jan. 13, 2021).

54

Page 2 GAO-27-108665 Immigration Detention

Page 8 of the original

55

2026.6 We assessed the reliability of the ICE and DOD data by (1) reviewing relevant documentation, (2) interviewing knowledgeable officials on their management of the data, and (3) testing for obvious errors. We determined the data were sufficiently reliable for describing detention facility costs for ICE and related DOD detention support.

56

To examine the extent to which ICE has developed processes and procedures for managing and overseeing these costs, we reviewed documentation related to (1) proposed detention space acquisitions and (2) facility invoices and monitoring efforts. Further, we interviewed ICE officials in budget, financial management, and acquisitions roles, as well as ICE Enforcement and Removal Operations (ERO) officials at the headquarters and field level with roles in cost management, cost oversight, and detention expansion.7 We also interviewed officials in DHS’s Office of the Chief Procurement Officer and Office of the Chief Readiness Support Officer involved in managing and overseeing large infrastructure and other investments within the department. We compared ICE’s efforts to expand detention space against Office of Management and Budget (OMB) guidance on cost-effectiveness analyses and DHS acquisition guidance on managing large investments. Appendix I describes our scope and methodology in greater detail.

57

We conducted this performance audit from July 2025 to November 2026 in accordance with generally accepted government auditing standards. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on our audit objectives. We believe that the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objectives.

58

Background

59

6In July 2026, we reported that DOD used multiple strategies to fund this support, including realigning and transferring funds and obligating amounts appropriated in OBBBA. Some of DOD’s support activities in fiscal year 2026 are eligible for reimbursement by DHS, as we discuss later in this report. GAO, Southern Border Security: DOD Used Multiple Strategies to Fund Operations, GAO-26-108437 (Washington, D.C.: July 13, 2026).

60

7We interviewed ICE officials at four of ERO’s 25 field offices and conducted site visits to existing or proposed detention facilities in two of these locations. We selected these field offices by prioritizing those responsible for more than five newly acquired or expanded facilities since January 2025 to focus on geographic areas of responsibility where ICE had focused its expansion efforts.

61

Page 3 GAO-27-108665 Immigration Detention

Page 9 of the original

62

ICE Organizational ERO identifies, apprehends, and detains potentially removable foreign Structure and nationals, and removes individuals subject to a final order of removal from the country. Several ERO divisions that carry out this work have detention Responsibilities facility management and oversight responsibilities, as well as ICE budgetary processes, including:

63

• The Field Operations Division. Oversees ERO’s 25 field offices, which manage local detention operations and work directly with detention facilities in their geographic regions. Field offices are generally responsible for identifying needs for additional detention space and preparing detention space acquisition requests.

64

• The Custody Management Division. Oversees detention facility compliance with ICE detention standards. It is also responsible for analyzing detention space needs identified by ERO field offices and submitting requests for detention contract and agreement action to ICE’s Office of Acquisition Management.

65

• The Operations Support Division. Oversees the ERO Budget Execution Unit and Contract Management Unit, which are responsible for funding contracts.

66

Other ICE offices that support the management and oversight of detention facilities include:

67

• ICE Office of Acquisition Management. Responsible for preparing, executing, and maintaining contracts and agreements for detention facilities, and for processing any contract and agreement modifications. Contracting officers within the office also assign duties and responsibilities to ERO contracting officer’s representatives (COR), whose work is overseen by ERO field office management. CORs assist in acquisition planning, facility invoice processing, and other duties, including assessing facility operator performance to ensure compliance with the government’s performance objectives.

68

• ICE Office of Budget and Program Performance. Manages ICE budget execution and formulation processes. Within the Office of the Chief Financial Officer, this office provides guidance to program offices on monitoring and distributing funds and approving program office spending plans. ICE Detention Facility As shown in table 1, ICE uses different types of detention facilities to Types house noncitizens. Detention services and standards at these facilities are governed by contracts or agreements with federal, state, or local government entities; or private companies.

69

Page 4 GAO-27-108665 Immigration Detention

Page 10 of the original

70

Table 1: Summary of U.S. Immigration and Customs Enforcement (ICE) Detention Facilities, as of June 2026

71

Number of authorized Facility Type Description a facilities

72

Contract detention ICE contracts directly with detention facility operators (e.g., private companies) to hold 25 facilities and service noncitizens at facilities the operators own, or to provide services at five ICE-owned service b processing centers processing centers. These contracts are generally governed by the Federal Acquisition Regulation, which includes requirements related to competition.

73

Dedicated and non- ICE enters into these agreements with state or local governments, which may provide detention 73 dedicated services directly or through private contracts. Intergovernmental service agreements that house intergovernmental only noncitizens detained by ICE are referred to as dedicated agreements. Facilities with non-service agreements dedicated agreements may house individuals detained by other agencies. c (IGSAs)

74

Intergovernmental ICE joins an existing Department of Justice U.S. Marshals Service agreement to use Marshals- 152 agreements with acquired bedspace in a local prison, jail, or private detention facility. This is known as a “rider” U.S. Marshals Service on a Marshals contract or agreement, and the ability to use the beds depends on availability.

75

Federal Bureau of In February 2025, ICE signed an interagency agreement to house noncitizens in eight 9 Prisons facilities Department of Justice Federal Bureau of Prisons facilities. Prior to 2025, ICE also had a preexisting arrangement to house noncitizens in a ninth Bureau facility in Puerto Rico.

76

Naval Station Starting in 2025, ICE began placing detained noncitizens at one Guantanamo Bay facility where 2 Guantanamo Bay ICE maintained an existing contract to house migrants interdicted at sea. That year, ICE also began housing noncitizens designated as “high-threat” at a second Guantanamo Bay facility under a memorandum of understanding with the Department of Defense.

77

Total authorized 261 facilities

78

Source: GAO summary of ICE information. | GAO-27-108665

79

a Authorized facilities have an active contract or agreement with ICE. Hold rooms—temporary spaces where detained noncitizens are held while awaiting processing, transfer, or removal—are not included. In addition to these facility types, ICE detained noncitizens in two facilities funded and operated by the state of Florida during fiscal years 2025 and 2026. ICE did not enter into a contract or agreement with Florida to operate these facilities. We discuss federal reimbursements to Florida later in this report. ICE also used four short-term staging facilities that house noncitizens temporarily while they await removal or transfer to a long-term facility. b Among these facilities is Camp East Montana, located on U.S. Army Fort Bliss. The Army awarded and administered a contract for constructing and operating this facility in fiscal year 2025 as part of a February 2025 Request for Assistance. The Army then transferred contract administration responsibilities for the facility to ICE at the beginning of fiscal year 2026. ICE now considers Camp East Montana a contract detention facility. c One IGSA facility, Dilley Immigration Processing Center, is counted twice because it houses both family units and single adult women, categories that are subject to different sets of detention standards for these populations.

80

Page 5 GAO-27-108665 Immigration Detention

Page 11 of the original

81

Funding for ICE Detention Increased Sharply in 2025, but Spending Plan Remains Undefined Available Funding for ICE received a significant increase in funds for detention facilities in fiscal Detention Facilities year 2025. Specifically, in July 2025, ICE received $45 billion through OBBBA, enacted through the reconciliation process, to support the Increased Significantly in expansion of detention capacity through fiscal year 2029.8 In comparison, Fiscal Year 2025 annual appropriations for detention operations from fiscal year 2023 through 2025 ranged approximately from $2.9 to $3.8 billion, about a third of the annualized OBBBA amount, as shown in figure 1.9

82

8Pub. L. No. 119-21, § 90003, 139 Stat. at 358. The reconciliation process is used by Congress to reconcile amounts determined by tax, spending, credit, and debt legislation for a given fiscal year with levels set in the concurrent resolution on the budget for the year. OBBBA multi-year detention funding is subject to an Office of Management and Budget apportionment process based on the agency’s approved annual spending plans. See, Office of Management and Budget, Circular A-11, Preparation, Submission, and Execution of the Budget, August 2025. In addition to the dedicated detention facility funding, ICE received nearly $30 billion (available until Sept. 30, 2029) that could be used for a variety of immigration enforcement activities including hiring and training ICE personnel, transportation costs, information technology investments, and facility upgrades to support ERO operations, among other purposes. The Act also provides $2.055 billion to the Secretary of Homeland Security (available until Sept. 30, 2029) for additional immigration-related purposes, including, among other activities: Immigration and Enforcement activities; Departures and Removals. Further, 50 percent of the new in absentia order, and inadmissible alien fees can be retained and expended by ICE without further appropriation. Id. at §§ 100051, 100052, 100016, 100017.

83

9Equal allocation of the $45 billion across 4 fiscal years is $11.25 billion, approximately 3 times more than the annual appropriation received in fiscal year 2025. In the March 2025 continuing resolution, ICE received additional funds for Operations and Support for the remainder of fiscal year 2025 above the fiscal year 2024 level. See Full-Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No 119-4, div. A, title VII, § 1701(1), 139 Stat. 9, 27. According to ICE’s July 2025 program execution report, ICE’s fiscal year 2025 appropriation for Custody Operations was $3.84 billion including additional funds from the fiscal year 2025 full-year continuing resolution for Operations and Support which ICE applied to Custody Operations.

84

Page 6 GAO-27-108665 Immigration Detention

Page 12 of the original

85

Figure 1: U.S. Immigration and Customs Enforcement (ICE) Immigration Detention Funding, Fiscal Year 2023-2026

86

a Annual and Continuing Appropriations refer to final, full-year appropriations, and continuing resolutions, extending prior year funding amounts when Congress is unable to reach agreement on appropriation levels for the current fiscal year. Prior to enactment of the One Big Beautiful Bill Act, immigration detention funding was generally provided through ICE’s annual appropriation under the ERO Custody Operations account. See 2024 Explanatory Statement, 170 Cong. Rec. H1501, H1812, H1850 (daily ed. Mar. 22, 2024), accompanying Further Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, 138 Stat. 460. In the March 2025 continuing resolution, ICE received additional funds for Operations and Support for the remainder of fiscal year 2025 above the fiscal year 2024 level. See Full-Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No 119-4, div. A, title VII, § 1701(1), 139 Stat. 9, 27. According to ICE’s July 2025 program execution report, ICE’s fiscal year 2025 appropriation for Custody Operations was $3.84 billion including additional funds from the fiscal year 2025 full-year continuing resolution for Operations and Support, which ICE applied to Custody Operations. In fiscal year 2026, DHS experienced lapses in appropriations, and ICE operated under continuing resolutions at fiscal year 2025 funding levels. Continuing Appropriations Act, 2026, div. A, Pub. L. No. 119-37, 139 Stat. 495 (Nov. 12, 2025); Further Continuing Appropriations Act, 2026, Pub. L. No. 119-75, div. H, 140 Stat. 173, 628 (Feb. 3, 2026); Homeland Security and Further Additional Continuing Appropriations Act, 2026, Pub. L. No. 119-86, § 4, 140 Stat. 773 (Apr. 30, 2026). Multi-year funding was subsequently provided to ICE through the Secure America Act, signed on June 10, 2026. Pub. L. No. 119-98, title II, § 202, 140 Stat. 837, 839. b Pub. L. No. 119-21, § 90003, 139 Stat. at 358. According to ICE officials, an additional $550 million in funding provided through section 100052 of this act for ICE operations was designated for facility modernization. Officials stated that ICE might make some improvements to detention facilities it currently owns; however, ICE primarily intends to use those funds to improve field offices and other office space, as well as complete deferred maintenance. c Pub. L. No. 119-98, title II, § 202, 140 Stat. 837. The act provides $31.075 billion for various purposes through fiscal year 2029. In August 2026, ICE reported approximately $1.1 billion was allocated for detention operations in fiscal year 2026.

87

Page 7 GAO-27-108665 Immigration Detention

Page 13 of the original

88

In fiscal year 2026, DHS (among other federal departments) experienced lapses in appropriations and operated under continuing resolutions at fiscal year 2024 funding levels, until enactment of DHS’s full-year appropriation (excluding ICE) on April 30, 2026.10 During the most recent DHS funding lapse, which began on February 14, 2026, OBBBA funding remained available to ICE for immigration detention and related purposes. On June 10, 2026, ICE received additional multi-year funding through the Secure America Act.11 According to officials, ICE allocated approximately $1.1 billion of this funding to detention operations in fiscal year 2026.

89

According to ICE officials, in addition to ICE’s annual appropriations (including continuing resolutions) and additional appropriations through the reconciliation process, the agency also received funding from several other sources that can be used for detention operations, which include:

90

• User fees. ICE is allocated a portion of user fees that U.S. Customs and Border Protection collects under several different programs.12 Allocations for ICE custody operations totaled about $118 million and $60.8 million in fiscal years 2024 and 2025, respectively.13

91

10A lapse in appropriations, commonly referred to as a government shutdown, refers to a period between the expiration of an appropriation and the enactment of a new one. Continuing resolutions typically extend prior year funding levels into the current fiscal year when the House and Senate are unable to reach agreement on final, full-year appropriation levels. Continuing Appropriations Act, 2026, div. A, Pub. L. No. 119-37, 139 Stat. 495 (Nov. 12, 2025); Further Continuing Appropriations Act, 2026, Pub. L. No. 119- 75, div. H, 140 Stat. 173, 628 (Feb. 3, 2026); Homeland Security and Further Additional Continuing Appropriations Act, 2026, Pub. L. No. 119-86, § 4, 140 Stat. 773 (Apr. 30, 2026).

92

11Pub. L. No. 119-98, title II, § 202, 140 Stat. at 839. This Act permits funding to be used for ICE’s mission support, including immigration enforcement functions and other activities, as well as detention facility maintenance and sustainment, among other purposes.

93

12User fee allocations to ICE include Immigration User Fees; Breached Bond Detention Fees; and Detention and Removal Office Fees. In addition, OBBBA authorized 50 percent of the new in absentia order, and inadmissible alien fees to be retained and expended by ICE without further appropriation. An in absentia order in immigration law is a court order issued by an immigration judge to remove a person from the U.S. without that person being present in court.

94

13Officials reported that ICE also received about $5.8 million in user fees in fiscal year 2026 under the continuing resolution.

95

Page 8 GAO-27-108665 Immigration Detention

Page 14 of the original

96

• Budget Transfers.14 In fiscal year 2025, DHS transferred $312.5 million from other DHS components to support expanded ICE detention facility operations.

97

ICE Used Available In fiscal year 2026, ICE used available OBBBA funds to help operate and Funding to Support maintain its existing network of detention facilities; ICE also began implementing an initiative to acquire and renovate a collection of large Existing Facilities and warehouses for use as detention facilities. However, after acquiring 11 Implement New Detention warehouses for a combined cost of about $1.07 billion, ICE scaled down Initiatives, but the Scope the initiative significantly after review by the new DHS Secretary. Officials of These Efforts Remains reported that ICE is working with the General Services Administration to sell seven of the recently acquired properties. In July 2026, ICE also Undefined acquired two existing contractor-operated facilities at a combined price of nearly $1.5 billion. Although ICE plans to make additional detention facility acquisitions in calendar years 2026 and 2027, officials were unable to provide specific details regarding the anticipated scope, time frames, and estimated costs for these future efforts.

98

ICE Obligated $9.1 Billion in ICE’s use of available OBBBA funds in fiscal year 2026 fell into four OBBBA Funds Through July categories: (1) support for ICE’s network of existing detention facilities, (2) 2026 warehouse acquisitions and related costs; (3) warehouse renovation and operating contracts, and (4) acquisitions of existing contract detention facilities.

99

Support for existing detention facilities. Beginning in fiscal year 2025, Budget Terminology ICE began using available OBBBA funds to help support its network of Obligations are binding agreements, such as contracts, purchase orders, or grants, that detention facilities, reporting obligations of approximately $3.3 billion commit an entity to make payments or 15 through June 2026. According to officials, ICE needed to use OBBBA expenditures, immediately or in the future. funds to support existing facilities during fiscal year 2026, particularly Deobligation is the cancellation or downward adjustment of previously incurred obligations. during the extended partial government shutdowns when ICE had not Expenditure is the actual spending of money; received funding through an annual appropriation or continued resolution. an outlay. We discuss additional information regarding facility costs and the number Source: GAO-05-734SP | GAO-27-108665 of new and expanded facilities later in this report.

100

Warehouse acquisitions and related costs. In January 2026, ICE also began implementing a new initiative to further expand detention capacity through purchasing and renovating a collection of warehouse facilities

101

14Transfers occur when an agency shifts funds from one appropriation account to another. An appropriation account is the basic unit of an appropriation and typically encompasses a number of activities or projects.

102

15Obligations totaled approximately $357 million in fiscal year 2025 and $2.9 billion in the first nine months of fiscal year 2026.

103

Page 9 GAO-27-108665 Immigration Detention

Page 15 of the original

104

nationwide. As a result, OBBBA obligations began to increase significantly. According to ICE documents, the proposed initiative (referred to as the Detention Reengineering Initiative) was originally envisioned to include eight large-scale detention centers and 16 regional processing centers, as well as 10 existing facilities where ICE already operates.16 In January 2026, ICE estimated that the new initiative would increase total detention capacity to 92,600 beds at an estimated cost of $38.3 billion.17 ICE expected many of the facilities to be operational by November 2026. See figure 2 for examples of two of the purchased warehouse detention facilities.

105

Figure 2: Examples of U.S. Immigration and Customs Enforcement (ICE) Warehouse Facilities

106

16According to ICE, the 16 Regional Processing Centers would each detain an average daily population of 1,000–1,500 noncitizens for average stays of 3–7 days. These are intended to serve as staging locations for transfers or removals. The large-scale detention facilities would be designed to detain 7,000–10,000 noncitizens for periods averaging less than 60 days. These larger sites would serve as the primary locations for international removals.

107

17According to ERO’s authorized facility list in April 2026, existing detention capacity is approximately 83,000 beds. ERO program officials reported that the Detention Reengineering Initiative was envisioned to largely replace the existing network of detention facilities when fully operational. ICE has provided various bedspace estimates for its facility expansion efforts, see GAO-26-108663 for additional information.

108

Page 10 GAO-27-108665 Immigration Detention

Page 16 of the original

109

As shown in table 2, ICE purchased 11 warehouse facilities between January and March 2026 (four large-scale and seven smaller processing centers) at a total cost of about $1.07 billion. The facilities ranged in cost between $35 million and $145 million. According to officials, additional acquisition and due diligence costs for these properties totaled approximately $12 million.

110

Table 2: Warehouse Facilities Purchased by U.S. Immigration and Customs Enforcement (ICE) as of March 2026

111

Warehouse location Facility typea Purchase price Reported due diligence costsb

112

Romulus, Michigan Processing center $34,671,500 $1,050,022

113

San Antonio, Texas Processing center $66,112,500 $1,064,896

114

Oakwood, Georgia Processing center $68,162,500 $1,045,729

115

Surprise, Arizona Processing center $70,035,000 $1,030,217

116

Hamburg, Pennsylvania Processing center $87,402,500 $1,374,788

117

Williamsport, Maryland Processing center $102,400,000 $1,154,284

118

Roxbury, New Jersey Processing center $129,300,000 $1,328,856

119

Tremont, Pennsylvania Large-scale facility $119,515,000 $1,346,927

120

Socorro, Texas Large-scale facility $122,808,000 $1,083,659

121

Social Circle, Georgia Large-scale facility $128,555,500 $1,047,971

122

Salt Lake City, Utah Large-scale facility $145,440,000 $781,897

123

Total $1,074,402,500 $12,309,246

124

Source: GAO summary of ICE data. | GAO-27-108665

125

a According to ICE documents, processing centers would each detain 1,000–1,500 noncitizens for a period of 3–7 days and are intended to serve as staging locations for transfers or removals. The large-scale facilities would be designed to detain 7,000–10,000 noncitizens for periods averaging less than 60 days. b According to ICE officials, related due diligence costs include, for example: market research, environmental due diligence and assessments, site condition assessments, zoning assessments, and title insurance.

126

Warehouse renovation and operating contracts. During the second quarter of fiscal year 2026, ICE also awarded renovation and operating contracts for the warehouses purchased in Williamsport, MD, and Surprise, AZ. ICE obligated $113 million and $313 million, respectively, in OBBBA funding for renovations and ramp-up activities at these facilities.

127

Purchase of existing contract detention facilities. In July 2026, ICE purchased two California contract detention facilities—California City Detention Facility and Otay Mesa Detention Center—for approximately

128

Page 11 GAO-27-108665 Immigration Detention

Page 17 of the original

129

$1.5 billion total.18 According to officials, purchasing such facilities in areas where state and local governments do not cooperate with ICE enforcement efforts would allow ICE more flexibility to increase or decrease bedspace as needed and help ensure that ICE is able to maintain operations in geographically important regions.

130

In total, ICE reported OBBBA detention obligations of approximately $9.1 billion through July 2026.19

131

Scope and Time Frames of Since ICE initiated its warehouse detention initiative in January 2026, it New Detention Initiatives has faced a series of setbacks and reduced the planned scope Remain Undefined significantly. As shown in figure 3, DHS paused new warehouse acquisitions and further awards for renovation or operating contracts for the warehouses pending review by the new Secretary of Homeland Security in March 2026. In addition, a number of lawsuits have challenged the planned operation of the facilities.20 Although officials reported in May 2026 that the agency was moving forward with plans to award renovation contracts for two additional facilities, they said that ICE no longer planned to use warehouses it recently purchased in several other locations. In June 2026, the Secretary of Homeland Security stated that DHS re-

132

18ICE reported a purchase cost of about $732.6 million for the California City facility (2,560 capacity) and about $739.2 million for Otay Mesa Detention Center (1,486 capacity).

133

19According to ICE officials, the reported OBBBA obligations include approximately $3 billion in OBBBA funds that remain in an escrow account to meet the terms of the warehouse purchases and fund additional acquisitions, as of August 2026.

134

20For example, in February 2026, the Attorney General of Maryland brought a lawsuit against DHS alleging a failure to conduct environmental impact studies (among other claims), and in April the Maryland federal district court issued a preliminary injunction halting work to retrofit the Hagerstown area warehouse for immigration detention purposes. Maryland v. Mullin, No. 26-cv-733, Order and Memorandum Opinion Granting Preliminary Injunction, ECF No. 42 & 43 (D. Md. Apr. 2026). As of October 7, 2026, the government confirmed continuing compliance with the preliminary injunction and that the only activities at the site since September 16 are activities in support of security and maintenance of the site and warehouse. Id. at ECF no. 68. In April 2026, the Arizona Attorney General sued DHS to block its use of a Surprise, Arizona warehouse as an immigration detention facility, and in June, Arizona and DHS reached an agreement to pause efforts to convert the facility at issue into an immigration detention center until environmental reviews are completed. Arizona v. Mullin, No. 26-cv-02857, Joint Stipulated Motion to Stay Case and Defer Preliminary Injunction Briefing, Stipulated Order Staying Case and Deferring Preliminary Injunction Briefing, ECF No. 18, 19 (D. Az. June & July 2026). As of September 4, 2026, ICE retained a contractor to assist with the environmental review, which remains ongoing. Arizona v. Mullin, No. 26-cv-02857, Defendants’ Status Report, ECF No. 20 (D. Az. Sep. 2026). As of November 4, 2026, the contractor has prepared, and ICE is reviewing a draft environmental assessment addressing the proposed retrofitting and use of the Surprise Facility. Id. at ECF No. 21.

135

Page 12 GAO-27-108665 Immigration Detention

Page 18 of the original

136

evaluated the warehouse detention model because the department had not conducted appropriate due diligence and planning.21 Later that month, ICE officials confirmed that the agency initiated plans with the General Services Administration to sell seven of the 11 warehouses.22

137

Given the ongoing legal challenges and limited progress toward renovating warehouses as planned, the scope, time frames, and associated costs of the four remaining warehouses remain uncertain. However, as of July 2026, officials stated that ICE plans to award renovation and operating contracts for the Roxbury, NJ, and San Antonio, TX, facilities by the end of fiscal year 2026. For each of the warehouses, ICE remains responsible for ongoing ownership costs, such as utilities and maintenance. For example, ICE reported that associated costs for the 11 warehouses totaled over $800,000, as of August 2026. ICE also incurred an estimated total of about $15.8 million for security-related costs for these facilities.

138

21Oversight of the Department of Homeland Security, Before the H. Subcom on Homeland Security Appropriations to Consider FY2027 Budget Request for DHS Programs, 119th Cong. H18-20260625-264438 (2026) (statement of the Secretary of Homeland Security Markwayne Mullin).

139

22According to ICE officials, the agency formally engaged with the General Services Administration and submitted property information to begin the process of disposing of these assets. Federal law requires federal agencies to identify and report excess real property. 40 U.S.C § 524. Once excess real property has been identified as surplus, the General Services Administration is required to supervise and direct its disposition. Id. § 541. The General Services Administration follows a multi-step process to dispose of excess real property, which may result in a competitive public sale. See GAO, Federal Real Property: GSA Should Create Goals to Ensure New Approach Saves Money and Accelerates Disposals of Unneeded Property, GAO-26-107760 (Washington, D.C., Apr. 9, 2026).

140

Page 13 GAO-27-108665 Immigration Detention

Page 19 of the original

141

Figure 3: Timeline of U.S. Immigration and Customs Enforcement (ICE) Warehouse Detention Initiative, January – June 2026

142

According to ICE officials, the purchase of existing contract detention facilities represents the next phase of the Detention Reengineering Initiative, but it remains uncertain to what extent ICE plans further acquisitions. In June 2026, officials told us ICE was considering purchasing additional facilities it currently utilizes in states such as New Jersey, Colorado, and Washington. ICE officials were unable to provide any specific details regarding the scope and potential time frames of this new initiative but anticipated that several of these acquisitions would be made in calendar years 2026 and 2027.23

143

23In August 2026, ICE also acquired a 1,600-bed facility in Appleton, Minnesota for approximately $495.6 million and a 1,033-bed facility in Leavenworth, Kansas for approximately $238.4 million.

144

Page 14 GAO-27-108665 Immigration Detention

Page 20 of the original

145

ICE Has Not Updated As of June 2026, ICE’s OBBBA spending plan for detention funding had 2026 OBBBA Spending not been updated to reflect the shifting status of the warehouse initiative or the planned detention facility acquisitions, which affects oversight Plan to Reflect Changing efforts and limits the ability to project longer-term budget needs. Conditions, Limiting the Specifically, the spending plan still included a total of approximately $38 Ability to Conduct Long- billion in planned obligations for fiscal year 2026. These planning Term Budget Planning estimates are the same as those reported in February 2026 and were not updated despite significantly changing conditions and delayed implementation of the warehouse initiative. Given the $9.1 billion in obligations reported through July 2026, it is not realistic that ICE would obligate an additional $29 billion over a period of just 2 months.

146

Moreover, the OBBBA spending plan for detention funding lacks supporting details to identify how funds are intended to be used or any estimated time frames for planned obligations. The plan provided indicates a single annual obligation estimate for each of the two primary OBBBA detention facility accounts (Operations and Support; and Procurement, Construction, and Improvements) without any additional project identifiers, descriptions, or details about the nature of the underlying projects or facility locations.

147

According to ICE guidance, spending plans are a critical internal control activity to strengthen financial management and program management. This guidance directs that spending plans be updated midway through the fiscal year, and as operations or other external factors change, such as new appropriations or reprogramming of funds. As we reported in May 2024, ICE has not always updated its spending plans in accordance with this ICE guidance.24 As of May 2026, ICE was in the process of updating its Spend Plan guidance for fiscal year 2027; however, the draft document ICE provided to us maintains the same criteria for required updates as existed in the prior version. Among other requirements, the draft guidance states that properly developed plans should include obligation breakouts by month as well as accounting details (such as applicable project and task identifiers) to facilitate transparency and accountability of ICE’s resources and financial management. We confirmed that ICE spending plans developed in fiscal year 2025 for the Custody Operations program included these elements.

148

24GAO, Financial Management: Additional Steps Needed to Improve ICE’s Budget Projections and Execution, GAO-24-106550 (Washington, D.C.: May 15, 2024).

149

Page 15 GAO-27-108665 Immigration Detention

Page 21 of the original

150

According to ICE budget officials, the initial OBBBA spending plan was developed quickly and was intended to identify the high-level categories of spending to be monitored across the multi-year funding availability time frame (July 2025 through September 2029). However, they stated that they received subsequent direction from administration leadership regarding spending requirements for fiscal year 2026 and were instructed to obligate most of the OBBBA funds by the end of fiscal year 2027. In July 2026, the officials told us that the budget office had recently requested updated OBBBA spending plans from each of the program offices and developed an agency-wide version that is to undergo review and approval from DHS and OMB. According to the ICE budget office, the updates should reflect changes regarding the warehouse initiative. However, as of October 2026, no additional evidence was provided regarding the extent to which the new versions incorporate more realistic projections of planned obligations for detention facilities or include any level of supporting details such as project and task identifiers.

151

Given the large amount of funding provided by the OBBBA and the 4-year time horizon, spending plans are a critical tool to help support longer-term budget planning. According to the ICE guidance, ICE uses spending plans to build and justify its mission requirements to DHS leadership, OMB, and Congress. By ensuring that OBBBA spending plans for detention funding are updated in a timely manner in accordance with internal guidance and based on realistic assumptions, ICE would be better positioned to manage these multi-year funds and provide more accurate information to oversight entities. Moreover, the current plan indicates that ICE plans to obligate any remaining OBBBA detention funds before the end of fiscal year 2027. If ICE does so, it may have limited funds available for required maintenance and support of detention operations through fiscal year 2029. More accurate spending plans would help ICE better assess longer term budget needs when OBBBA funding is no longer available.

152

Page 16 GAO-27-108665 Immigration Detention

Page 22 of the original

153

Detention Expansion Is Correlated with Higher-Cost Bedspace Annual Detention Costs ICE obligated about $2.8 billion to detain individuals in fiscal year 2025, Increased by 41 Percent in representing an increase from prior years amid expanded enforcement activity. In addition to acquiring and maintaining traditional facilities Fiscal Year 2025, Varying operated by private contractors and state or local governments, ICE also by Facility Type added detention space operated by other federal agencies. ICE’s costs at the facility and detained noncitizen level varied by ownership type, with newly acquired detention space at Federal Bureau of Prisons (BOP) facilities coming at a higher daily cost per detained noncitizen than any traditional facility type.

154

Annual Detention Costs As ICE expanded enforcement activity and detention space in response to executive orders and increased funding, its annual obligations for housing individuals in detention facilities increased. As shown in figure 4, ICE obligated approximately $2.8 billion on detention facilities in fiscal year 2025, 41 percent higher than in fiscal year 2024. Between those 2 fiscal years, the average daily population in ICE facilities increased to approximately 48,400—about 28 percent higher than in fiscal year 2024— and the number of detention facilities increased from 129 to 188.25 In the first three quarters of fiscal year 2026, ICE obligated about $2.9 billion to detention facilities.26 Average daily population and the number of facilities continued to increase, reaching approximately 59,400 detained noncitizens in 261 facilities as of June 2026.

155

25The state of Florida funded two detention facilities that ICE utilized in fiscal years 2025 and 2026. As ICE has not provided reimbursement to Florida, the data presented here do not include the costs of either facility. Later in this report, we discuss the Federal Emergency Management Agency’s reimbursements to the state of Florida for immigration detention.

156

26Fiscal year 2026 data are as of June 30, 2026. Further, ICE obligated over $1 billion to one facility, Camp East Montana, representing 36 percent of total obligations to detention facilities in the first three quarters of fiscal year 2026. We previously reported on cost efficiency concerns related to contract design and administration at Camp East Montana. We discuss these concerns and the details of ICE’s obligations for this facility below. GAO-26-108886.

157

Page 17 GAO-27-108665 Immigration Detention

Page 23 of the original

158

Figure 4: Immigration and Customs Enforcement (ICE) Detention Facility Obligations and Average Daily Population from October 2022 Through June 2026

159

a Fiscal year 2026 obligations data are as of June 30, 2026. ICE obligated over $1 billion to one facility, Camp East Montana, representing about 36 percent of total obligations to detention facilities in the first three quarters of fiscal year 2026. We discuss the details of ICE’s obligations for this facility later in this report. Camp East Montana is not included in the fiscal year 2025 data, when it was funded by the Department of Defense.

160

Note: These data do not include costs related to transportation of detained noncitizens. See appendix II for ground transportation costs related to ICE enforcement and removal activities. Further, the data do not include two state-funded Florida immigration detention facilities that ICE used but did not enter a contract or agreement to operate or reimburse. We discuss federal reimbursements to Florida later in this report and in appendix III.

161

Costs Per Detention Facility Detention costs per facility and detained noncitizen varied by ownership and Detained Noncitizen type in fiscal years 2025 and 2026. According to ICE officials, factors such as services provided, facility location, and ICE’s bedspace needs can influence facility costs. For example, ICE’s mission need for bedspace in certain geographic areas may take priority over costs. As shown in figure 5, the highest average obligations in fiscal year 2025 were among contract detention facilities and contract-operated service processing centers, which had an average daily population of about 650 and 760 detained noncitizens during that year, respectively. In comparison to contract-operated facilities, dedicated facilities with an intergovernmental service agreement (IGSA) had a higher average daily population of more than 900 detained noncitizens but were less costly on

162

Page 18 GAO-27-108665 Immigration Detention

Page 24 of the original

163

average. Below, we discuss differences in daily rates by facility type that further contextualize these variations in average annual obligations.27

164

Figure 5: Average Annual Obligations and Daily Population in Adult U.S. Immigration and Customs Enforcement (ICE) Detention Facilities by Type, Fiscal Year 2025

165

Note: These data do not include costs related to transportation of detained noncitizens; see appendix II for ground transportation costs. Further, we excluded one family facility and two juvenile facilities due to their different operating environments. We also excluded facilities that did not fall into the categories pictured above—that is, short-term staging facilities, Guantanamo Bay, and the Federal Bureau of Prisons (BOP) facilities that ICE utilized in fiscal year 2025. ICE does not track per-facility BOP obligations because BOP reports its costs at the aggregate level, according to ICE officials.

166

27ICE data do not allow us to examine per-facility obligations for the BOP facilities where ICE is currently detaining noncitizens. BOP aggregates these costs into one line item and does not provide ICE with per-facility data, according to ICE officials. We excluded the BOP line item from this analysis. Per an interagency agreement, ICE reimburses BOP for the full costs of each noncitizen accepted and housed by BOP, including daily bed costs, medical treatment, employee overtime and travel, and audits to assess compliance with ICE detention standards. ICE obligated about $42 million in fiscal year 2025 and $35 million in the first nine months of fiscal year 2026 to reimburse BOP.

167

Page 19 GAO-27-108665 Immigration Detention

Page 25 of the original

168

Specifically, we found that bed rates—the cost of detaining one noncitizen for one day—also vary by facility type. Bed rates include (1) bed and guard costs; (2) health care; (3) other direct costs, such as payments to detained noncitizens for voluntary work programs, supplies, and telecommunications; and (4) indirect, facility-wide costs such as rent, security, and equipment. As shown in figure 6, the bed rates documented in ICE’s adult facility contracts and agreements varied by facility type in April 2026.28 Specifically, BOP facilities had the highest median rate of any facility type, followed by contract-operated facilities.

169

Figure 6: U.S. Immigration and Customs Enforcement (ICE) Adult Detention Bed Rates by Facility Type, April 2026

170

a In February 2025, ICE signed an interagency agreement to house noncitizens in eight Federal Bureau of Prisons facilities. ICE also had a preexisting arrangement to house noncitizens in a ninth Bureau facility in Puerto Rico.

171

28Dilley Immigration Processing Center, which houses families and adult women in separate facilities, had a full capacity bed rate of about $220 in September 2025 and $208 in April 2026. ICE also used two juvenile facilities during this period, Grand Forks Juvenile and Northwestern Juvenile Detention Facility, with bed rates of $150 and $426 in both years, respectively.

172

Page 20 GAO-27-108665 Immigration Detention

Page 26 of the original

173

b We excluded one contract detention facility, Camp East Montana, because its contract is under negotiation and its bed rate is subject to change as of August 2026. c One IGSA facility is counted twice because two ICE field offices use this facility at different bed rates.

174

Note: We excluded one family facility and two juvenile facilities due to their different operating environments. The number of facilities may differ from other sources because it also includes facilities that ICE uses on a limited basis that are not included in the authorized facility list, according to officials. Further, some facilities use a tiered bed rate structure in which ICE pays different rates at different levels of bed usage. For those facilities, we calculated a theoretical bed rate based on 100 percent usage of all beds.

175

Our analysis identified the following trends by facility type: