- 518 paragraphs, read from the kept copy, kept . The words are the document’s own; the layout is the site’s. Its words are read line by line across each page; columns, tables and pictures are not kept here.
Page 26 of the original
directive31 and guidance32 that govern its foundational cybersecurity requirements, these documents did not describe how the agency is using the results of a business impact analysis to set minimum availability requirements for each data center that will meet the availability needs of its hosted information and information systems.
• State officials stated that its data centers meet availability requirements, and that the agency follows standards to minimize planned downtime to meet mission availability requirements and has adopted modern software development practices, such as cloud services. According to State officials, business impact analyses are conducted as part of the authorization to operate process. State also described how it conducts these business impact analyses. However, it did not sufficiently demonstrate that the agency has an internal control process for managing risks to data center availability, including using the results of a business impact analysis to set minimum availability requirements for all its data centers that will meet the availability needs of its hosted information and information systems.
• According to EPA officials, data center customers maintain signed business impact assessment statements and contingency plans that are updated annually. The agency also uses system security plans to identify and mitigate controls. However, the agency did not demonstrate that it is using the results of a business impact analysis to set minimum availability requirements for each data center that will meet the availability needs of its hosted information and information systems.
Meet information and physical security requirements. Four agencies fully addressed the requirement, and the remaining 17 partially addressed it. The agencies that fully addressed the requirement were DHS, State, Treasury, and NRC. For example, DHS’s Instruction Manual 121-01-010- 01 Physical Security describes how the agency meets physical security requirements, including how it uses an Interagency Security Committee risk management process and communicates with others, such as the Chief Security Officer, Facility Security Committee, and physical security officials, to complete the process for physical security of data center facilities. Additionally, its security and privacy plan describes controls on securing information and physical facilities of data centers. These include
31Department of Veterans Affairs, VA Cybersecurity Program, VA Directive 6500 (Washington, D.C.: Feb. 24, 2021).
32Department of Veterans Affairs, Risk Management Framework for VA Information Systems VA Information Security Program, VA Handbook 6500 (Washington, D.C.: Feb. 24, 2021).
Page 20 GAO-27-108971 Federal Data Centers
Page 27 of the original
its CIO working in coordination with other senior officials for security and facilities management within the agency to complete the Interagency Security Committee risk management process.
Seventeen agencies (Agriculture, Commerce, DOD, Energy, HHS, HUD, Interior, Justice, Labor, Transportation, VA, EPA, NASA, NSF, OPM, SBA, and SSA) partially addressed this requirement. These agencies reported that information systems used by a contractor to manage a data center comply with the appropriate agency policy for managing risks in accordance with FISMA requirements. These agencies also reported that they follow the Interagency Security Committee risk management process to determine the physical security needs for each data center facility and to implement the appropriate standards for countermeasures. However, these agencies either did not provide documentation or it was not sufficient to demonstrate that the CIO works in coordination with other senior officials for security and facilities management within their agency to complete the Interagency Security Committee risk management process for both new and existing data centers.
While most of the 21 agencies in our review stated that they believed they had addressed all five of OMB’s acquisition and operational requirements for their data centers, they did not provide evidence of full compliance. GAO is not making recommendations to the agencies because the OMB requirements expired on September 30, 2026, and the underlying FDCEA provisions sunset on October 1, 2026. Congress has introduced a variety of legislative proposals for data centers nationwide that are intended to, among other things, address data center energy use reporting and environmental requirements; electric grid, environmental, and public-health impacts of data centers; disclosure requirements for artificial intelligence data center development and site selection; and energy and water use reporting for large data centers. Although these legislative proposals apply more broadly to data centers nationwide, they may also impact federal data centers going forward. Moreover, since 2023 when the FDCEA was enacted, the demand for data storage and processing capacity, especially for artificial intelligence development and deployment, has increased. If Congress puts forth legislation to reauthorize or replace the FDCEA, it will have the opportunity to direct OMB to update the minimum acquisition and operational requirements for agencies to encourage continued focus on enhancing the cybersecurity, resiliency, and availability of new and existing federal data centers.
Congress has introduced various legislative proposals to make a variety Conclusions of changes that would affect data centers nationwide. Such changes are
Page 21 GAO-27-108971 Federal Data Centers
Page 28 of the original
complex, and the effects will vary based on the specific proposals. These legislative proposals may also have impacts on federal data centers. Moreover, since FDCEA was enacted in 2023, the current IT landscape has changed. The Act’s provisions sunset on October 1, 2026. Advances in artificial intelligence capabilities and its growing use among agencies have further increased demand for high-performance computing provided by data centers. Congress may prefer to reauthorize or replace FDCEA with new priority areas focused on broader modernization or cloud service requirements. In doing so, it would be important to review and update the minimum OMB requirements as appropriate. This report provides key insights into current federal data center acquisition and operational practices to inform Congress if it contemplates any changes to the management of federal data centers.
Congress should consider reauthorizing the FDCEA or replacing it with a Matter for new law reflecting updated priorities and OMB’s acquisition and Congressional operational requirements for agencies’ data centers. (Matter for Consideration 1) Consideration We provided a draft of this report to OMB and the 24 Chief Financial Agency Comments Officers Act agencies for their review and comment. We received a written letter from SSA stating that it did not have any comments— reproduced in appendix III. Six agencies—the Department of Commerce, the Department of Defense, the Department of the Treasury, National Aeronautics and Space Administration, OPM, and SSA—provided technical corrections, which we have incorporated into the report, as appropriate. Seventeen agencies (Agriculture, DHS, Education, Energy, EPA, GSA, HHS, HUD, Interior, Justice, Labor, NRC, NSF, SBA, State, Transportation, and VA) did not have any comments on our draft report. U.S. Agency for International Development did not respond because staff from the agency’s Office of the Executive Secretariat reported that other agency needs had taken priority. OMB did not provide comments on our draft report.
We are sending copies of this report to the appropriate congressional committees; the Director of OMB; the Secretaries of the Departments of Agriculture, Commerce, Defense, Education, Energy, Health and Human Services, Homeland Security, Housing and Urban Development, the Interior, Labor, State, Transportation, the Treasury, and Veterans Affairs; the U.S. Attorney General; the Administrators of the Environmental Protection Agency, General Services Administration, National Aeronautics and Space Administration, Small Business Administration, and the U.S. Agency for International Development; the Directors of the
Page 22 GAO-27-108971 Federal Data Centers
Page 29 of the original
National Science Foundation and the Office of Personnel Management; the Chairman of the Nuclear Regulatory Commission; and the Commissioner of the Social Security Administration. In addition, the report will be available at no charge on GAO’s website at http://www.gao.gov.
If you or your staff have any questions about this report, please contact Carol Harris at harriscc@gao.gov. Contact points for our Offices of Congressional Relations and Media Relations may be found on the last page of this report. GAO staff who made key contributions to this report are listed in appendix IV.
Carol C. Harris Director, Information Technology and Cybersecurity
Page 23 GAO-27-108971 Federal Data Centers
Page 30 of the original
Appendix I: ObjAeppecndixt Ii: Ovbjee,ctive, S Scopec, and ope, and Methodology Methodology
Our objective was to determine the extent to which federal agencies have incorporated the Office of Management and Budget’s (OMB) acquisition and operational requirements for data centers.
The scope of our review included the 24 federal agencies covered by the Chief Financial Officers Act of 1990 that also generally corresponds to the agencies covered by the Federal Information Technology Acquisition Reform Act.1 Three out of the 24 agencies (Department of Education, General Services Administration, and the U.S. Agency for International Development) stated that they do not have any data centers. As a result, they were not included in the analysis of compliance with OMB requirements.
To address the objective, we reviewed OMB’s implementation guidance for the Federal Data Center Enhancement Act of 2023 (FDCEA), Memorandum M-25-03, to identify the five requirements for federal agencies to incorporate when acquiring and operating agency-operated and contractor-operated data centers.2 In addition, we sought information from OMB staff in February 2026 and June 2026 on this FDCEA implementation guidance and any plans related to extending or renewing the provisions in the memorandum that expired on September 30, 2026. As of August 2026, OMB had not provided information in response to our questions.
To ensure consistent understanding and application of the requirements, we identified specific evaluation criteria in the OMB guidance that were associated with each of the five requirements. The five requirements and their associated evaluation criteria are listed in table 4.
1The 24 federal agencies covered by the Chief Financial Officers Act of 1990 are the Departments of Agriculture, Commerce, Defense, Education, Energy, Health and Human Services, Homeland Security, Housing and Urban Development, the Interior, Justice, Labor, State, Transportation, the Treasury, and Veterans Affairs; Environmental Protection Agency; General Services Administration; National Aeronautics and Space Administration; National Science Foundation; Nuclear Regulatory Commission; Office of Personnel Management; Small Business Administration; Social Security Administration; and U.S. Agency for International Development.
2Office of Management and Budget, Implementation Guidance for the Federal Data Center Enhancement Act, M-25-03 (Washington, D.C.: Jan. 14, 2025).
Page 24 GAO-27-108971 Federal Data Centers
Page 31 of the original
Appendix I: Objective, Scope, and Methodology
Table 4: Evaluation Criteria Associated with the Office of Management and Budget’s (OMB) Requirements for Acquiring and Operating Federal Data Centers
Requirement Evaluation criteria
Make key data center Agencies must centralize data center acquisition decision-making and operational management with the decisions at the agency agency’s Chief Information Officer (CIO). The requiring office and the relevant procurement official should level consult with the agency’s CIO throughout the process of procuring a new data center or making substantial changes to an existing one. Agencies should use commercial co-location services rather than building new data centers to the extent that it is cost-effective and meets agency mission needs.
Monitor data center Agencies must incorporate automated tools, such as Data Center Infrastructure Management systems, into operations the management of all new data centers, including tools that monitor facilities-related data such as electrical consumption. For existing data centers, agencies should adopt the use of such tools to the extent that it is cost-effective.
Incorporate energy and Agencies must evaluate data centers against resource consumption metrics and best practices when water usage into making their decisions. While designing or planning a new data center, including any substantial upgrades decision-making to an existing data center, agencies are required to arrange for an assessment by specialists certified in data center energy efficiency to better understand the existing data center’s resource usage and recommend design considerations to achieve improved efficiencies. Agencies are required to review and consider the recommendations resulting from the assessment when making data center design or selection decisions, in coordination with the agency’s Chief Sustainability Officer and the agency’s facilities management representatives.
Meet mission For both new and existing data centers, agencies must have an internal control process for managing risks availabilitya to data center availability that includes determining availability (uptime) requirements. Agencies must use the results of a business impact analysis, performed as part of an agency’s contingency planning processes, and relevant customer experience objectives to determine the maximum tolerable duration and frequency of downtime events for each of the information sets and information systems hosted in a data center. Using the results of that analysis, agencies must then set minimum availability requirements for each data center that will meet the availability needs of its hosted information and information systems.
Meet information and Information systems used by a contractor to manage a data center should comply with the appropriate physical security agency policy for managing risk in accordance with Federal Information Security Modernization Act requirements. For both new and existing data centers, agencies must follow the Interagency Security Committee risk management process to determine the physical security needs for each data center facility and to implement the appropriate standards for countermeasures. To complete the risk management process for physical security of the data center facility, agency CIOs must work in coordination with other senior officials for security and facilities management within their agency.
Source: GAO analysis based on OMB Memorandum M-25-03. | GAO-27-108971
a We did not assess agencies against implementing data center maintenance practices that minimize planned downtime for hosted information systems and following modern software development practices to reduce impacts of data center downtime. This is because OMB’s guidance did not specifically require agencies to do so. For example, the guidance notes that the agencies should implement data center maintenance practices that minimize planned downtime for hosted information systems where feasible and cost-effective. Additionally, guidance for following modern software development practices is broad and lacks measurable criteria to evaluate.
We requested relevant data center documentation from all 21 agencies and analyzed the documentation, including policies, procedures, and risk management and security plans, from the agencies that provided it. In some cases, the agencies did not have the requested information. We also obtained and analyzed responses from each of the 21 agencies to our semi-structured questions describing each agency’s number of data
Page 25 GAO-27-108971 Federal Data Centers
Page 32 of the original
Appendix I: Objective, Scope, and Methodology
centers and efforts to incorporate OMB’s requirements into their data centers. We then collected and compared agency documentation and responses to the requirements outlined in OMB Memorandum M-25-03. We supplemented our analysis with interviews or written communication with relevant agency officials to discuss the agencies’ progress toward addressing these requirements, as appropriate. We also provided the results of our analysis of agency documentation to officials to corroborate our findings, collected additional evidence, and identified causes for any gaps in agencies’ incorporation of the requirements. We then determined whether the evidence provided by the agencies addressed the evaluation criteria for each requirement. To determine an overall rating for each of the five requirements, we summarized the results of our assessments as:
• fully addressed—the agency fully addressed all of the requirement’s evaluation criteria;
• partially addressed—the agency fully or partially addressed some, but not all, of the requirement’s evaluation criteria; and
• not addressed—the agency did not address any of the requirement’s evaluation criteria
Additionally, in our assessment we noted where the requirement did not apply to the agency because it reported having no new data centers, and because OMB did not specifically require agencies to apply the requirement to existing data centers.
To assess the reliability of data agencies provided from their data center inventories or other systems, we reviewed the documentation (e.g., spreadsheets and screenshots) related to the number of data centers for obvious issues and for completeness. We also interviewed agency officials and reviewed each agency’s responses to questions about efforts to ensure that the data were accurate and complete. We determined that the agencies’ data were sufficiently reliable for the purposes of this report.
We conducted this performance audit from February 2026 to November 2026 in accordance with generally accepted government auditing standards. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on our audit objective. We believe that the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objective.
Page 26 GAO-27-108971 Federal Data Centers
Page 33 of the original
Appendix II: DeAtppaiendixl IeI: Detd Aailed Assessmsseesnt of Agsencmies’ ent of Incorporation of OMB’s Data Center Requirements Agencies’ Incor poration of OMB’s Data Center Requirements
This appendix contains detailed assessments of the extent to which the 21 federal agencies with new or existing data centers incorporated the Office of Management and Budget’s (OMB) five acquisition and operational requirements into their data centers.1
Department of Agriculture
Table 5: Extent to Which Department of Agriculture Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Partially Agriculture officials stated that the agency’s Chief Information Officer (CIO) has overall decisions at the agency addressed responsibility for data center acquisition decision-making and operational management. level However, the agency did not demonstrate that the requiring office and relevant procurement official consulted with the CIO throughout the process of procuring a new data center or making substantial changes to an existing one. Additionally, the agency did not demonstrate how it determined it was cost-effective and met agency mission needs to build a new data center rather than use commercial co-location services.
Monitor data center Partially Agriculture’s System and Organization Controls for Service Organizations report has operations addressed controls for monitoring its new contractor-operated data center, including the use of automated tools, such as the Data Center Infrastructure Management (DCIM) system. Agriculture officials also stated that the agency uses these automated tools to monitor its data center operations, such as electrical consumption. However, it did not provide supporting documentation showing that it was using these tools to monitor operations for its one reported new data center.
Incorporate energy and Partially Agriculture relies on the System and Organization Controls for Service Organizations water usage into decision- addressed report for its contractor-operated data center, which provides independent assurance making over controls governing the contractor’s use of the DCIM system to facilitate the exchange and analysis of data from energy; lightning; fire safety; and heating, ventilation, and air conditioning systems. Agriculture officials also stated that the agency utilizes DCIM tools for monitoring energy usage in agency-operated data centers and incorporates data into decision-making. However, no documentation was provided to demonstrate that while designing the new data center, the agency arranged for an assessment by specialists certified in data center energy efficiency.
1The Department of Education, the General Services Administration, and U.S. Agency for International Development did not report any data centers and thus were not included in our assessment.
Page 27 GAO-27-108971 Federal Data Centers
Page 34 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Requirement Assessment Summary of assessment
Meet mission availability Partially Agriculture relies on the System and Organization Controls for Service Organizations requirements addressed report for its contractor-operated data center, which provides independent assurance over controls governing system availability, including using a business impact analysis. Additionally, the agency’s risk analysis report identifies and evaluates system availability risks for its agency-operated data center. According to Agriculture officials, the agency operates under 99.9 percent uptime service level agreements supported by business impact analyses, annual disaster recovery testing with traffic being directed to a secondary site, redundant power infrastructure, backup generators, scheduled maintenance windows, and ongoing monitoring of uptime and power usage effectiveness. However, the agency did not demonstrate that it had an internal control process for managing risks to data center availability that used the results of a business impact analysis to set minimum requirements for each data center.
Meet information and Partially Agriculture officials stated that its data centers comply with key requirements and are physical security addressed subject to annual monitoring and independent review. Specifically, Agriculture’s System requirements and Organization Controls for Service Organizations report states that its contractor-operated data center includes the Federal Information Security Modernization Act and National Institute of Standards and Technology controls for physical and information security. However, for both its new data center and its existing data center, the agency did not provide documentation to demonstrate that the CIO works in coordination with other senior officials for security and facilities management within their agency to complete the Interagency Security Committee risk management process.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria. Source: GAO analysis of Department of Agriculture documentation. | GAO-27-108971
Department of Commerce
Table 6: Extent to Which Department of Commerce Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Partially Commerce officials stated that the agency’s component-level Chief Information decisions at the agency addressed Officers (CIO) are responsible for operational management and oversight of their level respective data centers. These officials stated that the agency is developing a data center policy memorandum that would establish the agency CIO as the central authority for all data center acquisitions and operational modifications. Officials stated that the memorandum would require mandatory Office of the CIO consultation and documented cost-effectiveness analyses, including assessments of commercial co-a location options, before approving new data center construction or major upgrades.
Monitor data center Partially While Commerce has draft memorandums that describe three of its components’ operations addressed approaches to implementing monitoring capabilities for new and existing data centers, agency officials stated that the agency is also developing a data center policy memorandum that would require the implementation of automated monitoring tools, including Data Center Infrastructure Management systems, and establish agencywide a minimum monitoring standards for both new and existing data centers.
Page 28 GAO-27-108971 Federal Data Centers
Page 35 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Requirement Assessment Summary of assessment
Incorporate energy and Partially Commerce officials stated that the agency is developing a data center policy water usage into decision- addressed memorandum that would require routine resource evaluations of data center making consumption against federal metrics, require certified energy efficiency specialist assessments during planning and design phases, and formalize coordination with the a agency’s Chief Sustainability Officer and facilities management officials.
Meet mission availability Partially Commerce’s Enterprise Services Center Service Level Agreement provides requirements addressed expectations for mission availability, including system availability metrics and disaster recovery data center services. Additionally, Commerce officials stated that each operating unit includes contractual service level agreement provisions related to data center availability and monthly reviews are regularly performed to confirm acceptable quality levels. Officials also stated that the agency is developing a data center policy memorandum that would establish a centralized internal control process using business impact analyses to define standardized uptime objectives, disaster recovery a requirements, and acceptable downtime tolerances for hosted systems.
Meet information and Partially Commerce’s Enterprise Cybersecurity Policy and Security and Privacy Assessment physical security addressed and Authorization documentation establish agencywide cybersecurity requirements requirements and processes for implementing, assessing, authorizing, and continuously monitoring security controls to protect information systems and support compliance with federal information and physical security requirements. Additionally, Commerce officials stated that the agency is developing a data center policy memorandum that would formalize agencywide compliance with the Federal Information Security Modernization Act, as well as National Institute of Standards and Technology and Interagency Security Committee risk management processes by requiring documented coordination a between the agency CIO, security leadership, and facilities management officials.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria. Source: GAO analysis of Department of Commerce documentation. | GAO-27-108971
a On October 16, 2026, while the report was at the agency for comment, the department finalized its data center policy to address compliance gaps and optimization, and strengthen alignment with OMB’s requirements, among other things. According to the policy, operating units and offices are required to implement the five OMB requirements, including the adoption of automated monitoring tools, within 90 business days.
Department of Defense
Table 7: Extent to Which Department of Defense (DOD) Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Fully According to the DOD Data Center Optimization Initiative memorandum, and Section decisions at the agency addressed 2867 of the National Defense Authorization Act for Fiscal Year 2012, components are level required to obtain Chief Information Officer (CIO) or designee approval prior to obligating funds for data centers or related technologies. The memorandum stated that DOD components use the IT Procurement Assessment Tool to support compliance with the agency’s data center procurement approval process and to collect information needed to report on the amount spent on data centers.
Page 29 GAO-27-108971 Federal Data Centers
Page 36 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Requirement Assessment Summary of assessment
DOD reported that the number of new data centers was to be determined. Therefore, we did not assess whether the requiring office and the relevant procurement official consult with the agency’s CIO throughout the process of procuring a new data center or making substantial changes to an existing one. Also, we did not assess whether the agency uses commercial co-location services rather than building new data centers to the extent that it is cost-effective and meets agency mission needs.
Monitor data center Fully For its existing data centers, according to the DOD Data Center Optimization Initiative operations addressed memorandum, the Data Center Infrastructure Management system is the agency’s authoritative database for data center inventory reporting. It captures the current disposition of data center assets to include the type, location, size, and total physical and virtual server counts. DOD reported that the number of new data centers was to be determined. Therefore, we did not assess whether the agency incorporated automated tools into the management of all new data centers.
Incorporate energy and — DOD reported that the number of new data centers was to be determined. Therefore, water usage into decision- we did not assess whether the agency evaluated data centers against resource making consumption metrics and best practices when making decisions. DOD officials stated that the agency has incorporated sustainable energy sources and efficiency metrics into its decisions to maintain, upgrade or build new data centers. For existing data centers, these officials stated that its Data Center Reference Architecture ensures that its data centers deliver DOD information technology (IT) services in a manner optimized for performance and efficiency.
Meet mission availability Partially DOD officials stated that the CIO has integrated standards into its enterprise-wide requirements addressed Mission Network-as-a-Service framework, Data Center Reference Architecture, and cybersecurity policy to ensure that all data centers meet uptime and resiliency benchmarks required for multi-domain operations. However, it has not demonstrated that the agency used the results of a business impact analysis to set minimum availability requirements for each data center.
Meet information and Partially DOD officials stated that it has policies in place for meeting information and physical physical security addressed security requirements for its data centers. However, for both new and existing data requirements centers, the agency did not provide documentation to demonstrate that the CIO works in coordination with other senior officials for security and facilities management within their agency to complete the Interagency Security Committee risk management process.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria; — = The requirement did not apply to the agency as it reported it had no new data centers and because the Office of Management and Budget did not specifically require agencies to apply the requirement to existing data centers. Source: GAO analysis of Department of Defense documentation. | GAO-27-108971
Page 30 GAO-27-108971 Federal Data Centers
Page 37 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Department of Energy
Table 8: Extent to Which Department of Energy Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Partially According to Energy officials, the agency has established an enterprise governance decisions at the agency addressed framework through which the Chief Information Officer (CIO) is actively engaged in level the planning, budgeting, and execution of all information technology (IT) acquisitions. However, the agency has not sufficiently demonstrated that the requiring office and the relevant procurement official consult with the agency’s CIO throughout the process of procuring a new data center or making substantial changes to an existing one. Furthermore, for the 29 percent of data centers reporting no CIO involvement, the agency stated that these facilities operate under a decentralized governance structure in which program offices, rather than the centralized CIO organization, oversee IT management.
Monitor data center Partially According to Energy officials, the agency reported having one new data center, which operations addressed is partially implementing the Data Center Infrastructure Management (DCIM) system or other automated tools to monitor facilities-related data. These officials noted that this new data center plans to fully implement DCIM systems once construction begins in July 2027. Energy officials also stated that approximately 90 percent of its existing data centers reported implementing automated tools, including the DCIM system, to monitor facilities-related data, such as electrical consumption.
Incorporate energy and Partially According to Energy officials, while the agency reported having one new data center, water usage into decision- addressed it plans to obtain an assessment by specialists certified in data center energy making efficiency once construction begins in July 2027. However, no documentation about these plans was provided. Officials also stated that for its existing data centers, approximately 88 percent reported fully or partially conducting energy and water assessments in coordination with the agency’s Chief Sustainability Officer and facilities management representatives on a regular basis.
Meet mission availability Partially According to Energy officials, approximately 91 percent of data centers reported fully requirements addressed or partially implementing internal control processes to manage data center availability risks. Energy officials stated that data centers reporting no implementation efforts cited key challenges, including resource and funding limitations. To address these gaps, the officials stated that many facilities are actively transitioning toward compliance by implementing cloud resiliency services, deploying automated monitoring tools, or establishing new IT risk management contracts.
Meet information and Partially According to Energy officials, approximately 88 percent of data centers adhered to physical security addressed the Interagency Security Committee risk management process. Energy officials requirements stated that about 11 percent reported partial implementation and stated that they have ongoing initiatives to complete implementation. Furthermore, the remaining 1 percent of data centers reported managing physical security through other frameworks or incorporating Interagency Security Committee guidance into the design phase of new facilities.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria. Source: GAO analysis of Department of Energy documentation. | GAO-27-108971
Page 31 GAO-27-108971 Federal Data Centers
Page 38 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Department of Health and Human Services
Table 9: Extent to Which Department of Health and Human Services (HHS) Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Partially According to HHS officials, the Chief Information Officer (CIO), or its designated decisions at the agency addressed component’s CIO, is responsible for data center acquisition decision-making and level operational management. However, the agency did not demonstrate that the requiring office and relevant procurement official consult with the CIO throughout the process of procuring a new data center or making substantial changes to an existing one. Furthermore, the agency did not demonstrate how it determined it was cost-effective and met agency mission needs to build a new data center rather than using commercial co-location services.
Monitor data center Partially HHS provided examples of how its components incorporate automated tools, such as operations addressed the Data Center Infrastructure Management system, into the management of its data centers, including tools that monitor facilities-related data such as electrical consumption. However, only one component reported having new data centers, and the agency did not provide supporting documentation to demonstrate how it incorporates these tools into the management of the new data centers. Additionally, for its existing data centers, it did not provide supporting documentation demonstrating its use of such tools.
Incorporate energy and Partially HHS officials stated that data center decisions are made at the component level for water usage into decision- addressed this requirement. For example, one component stated that it incorporates energy making efficiency considerations into its data center infrastructure upgrades intended to improve efficiency and reduce energy consumption. However, the component with the new data centers did not provide documentation to demonstrate that while designing the new data centers, it had arranged for an assessment by certified data center energy efficiency specialists.
Meet mission availability Partially HHS officials stated that data center decisions are made at the component level for requirements addressed this requirement. While HHS provided documentation demonstrating that one of its components was meeting mission availability requirements, it did not do so for all its components. Specifically, it did not demonstrate that HHS had an internal control process for managing risks to data center availability that used the results of a business impact analysis to set minimum requirements for each data center.
Meet information and Partially HHS officials stated that data center decisions are made at the component level for physical security addressed this requirement. However, for both new and existing data centers across the agency, requirements it did not provide documentation to demonstrate that the HHS CIO works in coordination with other senior officials for security and facilities management within the agency to complete the Interagency Security Committee risk management process.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria. Source: GAO analysis of Department of Health and Human Services documentation. | GAO-27-108971
Page 32 GAO-27-108971 Federal Data Centers
Page 39 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Department of Homeland Security
Table 10: Extent to Which Department of Homeland Security (DHS) Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Fully addressed DHS’s delegation document states that the DHS Chief Information Officer (CIO) has decisions at the agency delegated authority for the approval, management, and oversight of the agency’s level resources, including data center investments. DHS reported that it has no new data centers. Therefore, we did not assess whether the requiring office and the relevant procurement official consult with the agency’s CIO throughout the process of procuring a new data center or making substantial changes to an existing one. Also, we did not assess whether it uses commercial co-location services rather than building new data centers to the extent that it is cost-effective and meets agency mission needs.
Monitor data center Fully addressed For its existing data centers, the agency uses automated tools to monitor the operations operations of its data centers. Specifically, DHS’s Performance Work Statement for Data Center and Cloud Optimization Support Services and Quality Assurance Surveillance Plan describe procedures and service level requirements for the agency’s information technology infrastructure and systems, including the use of automated monitoring capabilities. DHS reported that it has no new data centers. Therefore, we did not assess whether the agency incorporated automated tools into the management of all new data centers.
Incorporate energy and — DHS reported that it has no new data centers. Therefore, we did not assess whether water usage into decision- the agency evaluated data centers against resource consumption metrics and best making practices when making decisions.
Meet mission availability Partially The agency has established internal control processes to manage risks to availability requirements addressed in its Concept of Operations and Standard Operating Procedure documentation. Additionally, its Performance Work Statement for Data Center and Cloud Optimization Support Services and risk management implementation plan and guide describe how availability requirements are managed for its data center and risk management process. However, these documents did not demonstrate that the agency used the results of a business impact analysis to set minimum availability requirements for each data center.
Meet information and Fully addressed The agency’s Instruction Manual 121-01-010-01 Physical Security describes how the physical security agency meets physical security requirements, including how it uses an Interagency requirements Security Committee risk management process and communicates with others, such as the Chief Security Officer, Facility Security Committee, and physical security officials, to complete the process for physical security of the data center facilities. Additionally, its security and privacy plan describes controls on securing information and physical facilities of the data centers. Furthermore, DHS’s CIO works in coordination with other senior officials for security and facilities management within their agency to complete the Interagency Security Committee risk management process.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria; — = The requirement did not apply to the agency as it reported it had no new data centers and because the Office of Management and Budget did not specifically require agencies to apply the requirement to existing data centers. Source: GAO analysis of Department of Homeland Security documentation. | GAO-27-108971
Page 33 GAO-27-108971 Federal Data Centers
Page 40 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Department of Housing and Urban Development
Table 11: Extent to Which Department of Housing and Urban Development (HUD) Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Partially HUD reported that the agency has centralized data center acquisition decision-decisions at the agency addressed making and operational management under its Chief Information Officer (CIO) but did level not demonstrate how the CIO is making key data center decisions. HUD reported that it has no new data centers. Therefore, we did not assess whether the requiring office and the relevant procurement official consult with the agency’s CIO throughout the process of procuring a new data center or making substantial changes to an existing one. Also, we did not assess whether it uses commercial co-location services rather than building new data centers to the extent that it is cost-effective and meets agency mission needs.
Monitor data center Fully addressed For its existing data centers, HUD uses automated monitoring tools such as the Data operations Center Infrastructure Management system. HUD reported that it has no new data centers. Therefore, we did not assess whether the agency incorporated automated tools into the management of all new data centers.
Incorporate energy and — HUD reported that it has no new data centers. Therefore, we did not assess whether water usage into decision- the agency evaluated data centers against resource consumption metrics and best making practices when making decisions.
Meet mission availability Partially HUD officials stated that for all applicable data centers, the agency has implemented requirements addressed risk avoidance and mitigation controls to meet availability targets. However, the agency did not demonstrate that it had an internal control process for managing risks to data center availability that used the results of a business impact analysis to set minimum requirements for each data center.
Meet information and Partially HUD officials stated that the agency inherits Federal Information Security physical security addressed Modernization Act compliance and National Institute of Standards and Technology requirements security controls from hosting providers to meet security requirements and has adhered to Interagency Security Committee risk management processes related to physical security of all covered data centers. HUD also provided documentation that establishes the standards, guidelines, and procedures relating to the operational security and the physical protection of the facility and assets. However, for both new and existing data centers, the document provided did not state that the CIO works in coordination with other senior officials for security and facilities management within their agency to complete the Interagency Security Committee risk management process.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria; — = The requirement did not apply to the agency as it reported it had no new data centers and because the Office of Management and Budget did not specifically require agencies to apply the requirement to existing data centers. Source: GAO analysis of Department of Housing and Urban Development documentation. | GAO-27-108971
Page 34 GAO-27-108971 Federal Data Centers
Page 41 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Department of the Interior
Table 12: Extent to Which Department of the Interior Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Fully According to Interior’s Departmental Manual Part 112 Chapter 24 and Hosting Services decisions at the agency addressed Policy documents, data center acquisition decision-making and operational management level are centralized with the Chief Information Officer (CIO), and the requiring office and relevant procurement official consult with the CIO throughout the budget and acquisition process. While Interior does not have any new data centers, the policy document directs the use of commercial services as the preferred first option, prior to consideration of agency-built data centers.
Monitor data center Partially For its existing data centers, Interior officials stated that the agency has partially operations addressed implemented automated monitoring tools and plans to expand deployment to remaining data centers to the extent that it is cost effective. Interior reported that it has no new data centers. Therefore, we did not assess whether the agency incorporated automated tools into the management of all new data centers.
Incorporate energy and — Interior reported that it has no new data centers. Therefore, we did not assess whether water usage into decision- the agency evaluated data centers against resource consumption metrics and best making practices when making decisions. Interior’s key mission facility policy codifies the requirement to implement automated energy and water metering for data centers larger than 1,000 square feet, but not all data centers.
Meet mission availability Partially Interior’s Data Center Classification, Reporting, and Key Mission Facility Requirements requirements addressed policy stated that for its new data centers, the agency must meet minimum high standards for requirements, including availability. Also, Interior’s Hosting Services Policy states that the agency’s bureau or Office Associate CIOs must submit a request for approval to make a financial decision related to a data center, including a description of how the center will enable the hosted information or information systems to meet appropriate availability and uptime requirements. According to Interior officials, individual data center managers are monitoring data center availability, without centralized enterprise tracking or reporting. However, Interior did not sufficiently demonstrate that the agency had an internal control process for managing risks to data center availability that used the results of a business impact analysis to set minimum requirements for each data center.
Meet information and Partially According to Interior officials, physical access to data center facilities is controlled and physical security addressed the Office of the CIO manages logical access to systems, while data center managers requirements are responsible for facility access controls and building security systems. Interior’s Hosting Services Policy requires the agency to submit a request for approval to make a financial decision related to a data center, including a statement of assurance that the data center will meet the appropriate information and physical security requirements. However, for both new and existing data centers, the document provided did not state that the CIO works in coordination with other senior officials for security and facilities management within their agency to complete the Interagency Security Committee risk management process.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria; — = The requirement did not apply to the agency as it reported it had no new data centers and because the Office of Management and Budget did not specifically require agencies to apply the requirement to existing data centers. Source: GAO analysis of Department of the Interior documentation. | GAO-27-108971
Page 35 GAO-27-108971 Federal Data Centers
Page 42 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Department of Justice
Table 13: Extent to Which Department of Justice Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Fully addressed Justice’s Policy Statement 0900.01 and Data Center Actions Information Technology decisions at the agency Action memorandum establish Chief Information Officer (CIO) oversight of level information technology (IT) and data center investments, including review and approval of applicable component acquisition plans and data center proposals. Additionally, the memorandum describes a process to request Justice’s CIO’s approval in advance of any related task initiation or funding. It provides a mechanism for CIO involvement in acquisition decision-making consistent with the Office of Management and Budget’s expectation that the requiring office and relevant procurement official consult with the CIO throughout the process of procuring a new data center or making substantial changes to an existing one. Justice reported that it has no new data centers. Therefore, we did not assess whether it uses commercial co-location services rather than building new data centers to the extent that it is cost-effective and meets agency mission needs.
Monitor data center Fully addressed Justice’s Data Center Actions Information Technology Action memorandum states operations that the agency must implement the Data Center Infrastructure Management system for new and existing data centers and when making substantial upgrades to existing data centers. Justice reported that it has no new data centers. Therefore, we did not assess whether the agency incorporated automated tools into the management of all new data centers.
Incorporate energy and — Justice reported that it has no new data centers. Therefore, we did not assess water usage into decision- whether the agency evaluated data centers against resource consumption metrics making and best practices when making decisions. Justice’s Data Center Actions Information Technology Action memorandum indicates that if a component plans to procure a new data center or if the component is planning to make substantial upgrades to an existing data center, then the data center is subject to additional compliance requirements, including completing a resource (e.g., energy, water) efficiency assessment.
Meet mission availability Fully addressed Justice’s Cybersecurity Program Order and Information System Contingency Plan requirements require components to define system availability requirements including using the results of a business impact analysis, implementing contingency planning, and managing risks to ensure the availability and continuity of mission-critical information systems, which include data centers. Additionally, according to Justice’s Data Center Actions Information Technology Action memorandum, component CIOs operating data centers must establish a target availability of 99.8 percent for each component-operated data center and report actual availability for the data center on a semi-annual basis via a data call. Risks affecting each data center’s availability must be identified and mitigated in accordance with Justice’s Information Systems Contingency Planning Guide.
Page 36 GAO-27-108971 Federal Data Centers
Page 43 of the original
Appendix II: Detailed Assessment of Agencies’ Incorporation of OMB’s Data Center Requirements
Requirement Assessment Summary of assessment
Meet information and Partially According to Justice’s Data Center Actions Information Technology Action physical security addressed memorandum, component CIOs must ensure compliance with the agency’s requirements cybersecurity policy and the Interagency Security Committee risk management process related to the physical security for each component-operated data center. Justice’s IT Order 0904 Cybersecurity Program states the requirements for managing information security, including National Institute of Standards and Technology and Financial Information Security Modernization Act guidance. However, for both new and existing data centers, the documents provided did not state that the CIO works in coordination with other senior officials for security and facilities management within their agency to complete the Interagency Security Committee risk management process.
Fully addressed: The agency fully addressed all of the requirement’s evaluation criteria; Partially addressed: The agency fully or partially addressed some, but not all of the requirement’s evaluation criteria; Not addressed: The agency did not address any of the requirement’s evaluation criteria; — = The requirement did not apply to the agency as it reported it had no new data centers and because the Office of Management and Budget did not specifically require agencies to apply the requirement to existing data centers. Source: GAO analysis of Department of Justice documentation. | GAO-27-108971
Department of Labor
Table 14: Extent to Which Department of Labor Addressed the Five Office of Management and Budget Acquisition and Operational Data Center Requirements, as of August 2026
Requirement Assessment Summary of assessment
Make key data center Fully addressed Labor’s data center acquisition and operational decisions are centralized under the decisions at the agency Chief Information Officer (CIO). level While Labor did not report any new data centers, it stated that the agency uses commercial solutions through the Equinix co-location facility and expanded use of cloud services. We did not assess whether the requiring office and the relevant procurement official consult with the agency’s CIO throughout the process of procuring a new data center or making substantial changes to an existing one.
Monitor data center Fully addressed For its existing data centers, Labor uses a Data Center Infrastructure Management operations tool to monitor power, environmental conditions, and mechanical and electrical systems in real time across its co-located data center footprint. Labor reported that it has no new data centers. Therefore, we did not assess whether the agency incorporated automated tools into the management of all new data centers.
Incorporate energy and — Labor reported that it has no new data centers. Therefore, we did not assess whether water usage into decision- the agency evaluated data centers against resource consumption metrics and best making practices when making decisions. For its existing data centers, the agency stated that it relies on an energy efficiency program at its facility to monitor power usage effectiveness, cooling, and electricity use and support planning for its co-located data center.