Delaware · HB 233
Delaware HB 233: what changed from Draft to Engrossed
What changed in this version
161 words unchanged, in 5 paragraphs
(12) Meet any other conditions the Commission may require in the public interest, including the extent to which the large energy use facility uses local labor that is paid a prevailing wage.
(d) In determining whether to approve an ESA, the Commission shall consider all of the following:
(1) Whether the ESA is consistent with regulations promulgated by the Commission governing ESAs.
(2) Whether the ESA , in combination with the underlying tariff, ensures that all applicable costs attributable to the large energy use facility are directly assigned to the large energy use facility. In making this determination, the Commission shall consider the results of any applicable Incremental Cost Test, as provided for in § 317 of this title.
(3) Whether the ESA, in combination with the underlying tariff, provides protections necessary to ensure that other customers of the Commission-regulated electric utility are not placed at risk for paying stranded costs associated with the Commission-regulated electric utility serving the large energy use facility.
(4) The need for and impact of the project proposed by the large energy use facility on the safe, adequate, and reliable operation or delivery of electric supply services. [removed: It] [added: The following] shall be considered [removed: a] positive [removed: factor] [added: factors, but not requirements,] in evaluating an [removed: ESA] [added: ESA,] if a large energy use facility constructs or causes the construction of new generation, where such new generation: (i) is located within [added: Delaware or within PJM's DPL transmission zone or within a transmission zone contiguous by land to the DPL transmission zone, with sufficient existing transmission infrastructure to deliver this additional electricity to] Delaware; (ii) [removed: has not] [added: includes newly constructed generation at an existing facility, uprates, or repowering of deactivated or retired generating units as of June 12, 2026; provided that capacity that] previously participated in the PJM Base Residual [removed: Auction;] [added: Auction qualifies only to the extent attributable to such uprate or repowering;] (iii) matches the [removed: load characteristics] [added: megawatt demand] of the large energy use facility; [removed: and] (iv) [added: repurposes existing transmission interconnection infrastructure, land, or other generation-related assets associated with a prior in-state facility; (v)] is determined by the State Energy Office to be consistent with the achievement of the State’s greenhouse gas emissions reductions targets, as specified in § 10003 of Title [removed: 7, and] [added: 7; or (vi) is determined by the State Energy Office to be consistent with] the State’s renewable portfolio standards, as specified in § 354 of this title. It shall further be considered a positive factor in evaluating an ESA if a large energy use facility agrees to demand flexibility terms to assist with energy affordability, including demand flexibility during periods of dramatically increased wholesale electricity costs.
133 words unchanged, in 3 paragraphs
(5) The extent to which the large energy use facility will use a local labor force for construction and ongoing operation, and the extent to which the project will pay such labor force a prevailing wage.
(6) The impact of the large energy use facility on the area in which it is to be located, including the possibility that the large energy use facility provides a Community Benefits Agreement to ameliorate any negative impacts.
(7) The impact of approving the ESA on the State’s economy, the impacts to the State’s ratepayers, and whether the application is consistent with the achievement of the State’s greenhouse gas emissions reductions targets, as specified in § 10003 of Title 7, and whether the application is consistent with the State’s renewable portfolio standards, as specified in § 354 this title.
(8) The impact of approving [removed: the] [added: an] ESA on the health, safety, and welfare of the general public.
(9) The demonstrated experience, operating expertise, and long-term viability of the large energy use facility or its affiliates, partners, or parent company.
(e) The Commission must act on an application to approve [removed: a negotiated] [added: an] ESA within 90 days of the submission of a completed application. For good cause shown, and if it finds that the public interest would be served, the Commission may extend the date of its action on an application for an additional period not to exceed 90 days. The application for approval of an ESA must be in writing, in such form as determined by the Commission, and contain such data, studies, documentation, or other information as the Commission shall prescribe. The application must include all of the following:
107 words unchanged, in 9 paragraphs
(1) The impact of the plan on transmission capacity.
(2) Upgrades, if any, to transmission or distribution infrastructure associated with the plan.
(3) The amount of electricity utilized by generation type and whether it is sourced from new or existing generation.
(4) How electricity use will be curtailed during high demand periods.
(5) The quantity and type of on-site back-up power, if any.
(6) The anticipated lifespan of the facility.
(7) Whether the business will trigger supplemental transmission projects.
(8) A study of the impact of the plan on electricity costs in Delaware.
(9) A study of the impact of the plan on grid reliability in Delaware.
(f) The Commission may revise and adjust its regulations in response to federal or PJM [removed: programs] [added: laws, rules, regulations, or tariffs] regarding the introduction of large energy use facilities throughout the PJM region. The Commission may work to ensure that changes in capacity market operation, transmission cost allocation, or other processes at the PJM level will not, to the maximum extent possible, result in higher costs for Delaware ratepayers not included in the large energy use facility classification. Any adjustments to the tariff specified in § 317 of this title, or in the regulations governing ESAs, must aim to assure that any new obligations fall upon the class of energy users causing such obligations.
175 words unchanged, in 3 paragraphs
(g) A facility in operation as of [the effective date of this Act] may not be considered a large energy use facility. However, a change to an existing facility that increases the usage above the thresholds defined for a large energy use facility will trigger the provisions of this chapter requiring the approval of an ESA.
(h) An ESA may not be transferred from the applicant to another person or entity without the written approval of the Commission.
(i) Commission-regulated electric utilities shall be required to provide to the Commission annually detailed, project-specific information for each anticipated large energy use facility, including development status, evidence of financial commitment, ramp schedules, and any duplicative interconnection requests. The Commission shall submit a report listing the ESA applications received and their disposition for the prior year to the Governor, the Director and Librarian of the Division of Legislative Services, and the Secretary of the Senate and the Chief Clerk of the House for distribution to members of the General Assembly not later than December 31st of each year.
(j) ESAs and TSAs must be interpreted and administered in a manner consistent with Chapter 10 of this title, including the State policy of retail competition and direct access. Nothing in this section, § 317 of this title, or any regulation promulgated hereunder shall be construed to do any of the following:
(1) Limit or impair the right of any retail electric customer, including a large energy use facility, to purchase electric supply service from a certified electric supplier.
(2) Require a large energy use facility to procure electric supply service from a Commission-regulated electric utility.
(3) Condition interconnection, distribution service, or transmission service upon the customer’s agreement to take electric supply service from a Commission-regulated electric utility.
173 words unchanged, in 5 paragraphs
Section 3 . Amend Subchapter III, Chapter 1, Title 26 of the Delaware Code by making deletions as shown by strike through and insertions as shown by underline as follows, and redesignating accordingly:
§ 317. Rates for large energy use facilities.
(a) Commission-regulated electric utilities must, within 180 days after finalization of the regulations under § 203G of this title, establish a classification of service for retail electricity consumers that are large energy use facilities. The classification of service must be separate and distinct from classifications of service for other commercial or industrial retail electricity consumers and have its own tariff schedule.
(b) All Commission-regulated electric utilities shall develop a load shed protocol to allow large energy use facilities to be curtailed in anticipation of or during emergency conditions, including the installation of any necessary equipment or technology before a customer is interconnected. This subsection applies only to a load interconnected after December 31, 2026.
(1) The load shed protocol, to the extent feasible and consistent with reliability and safety, shall do all of the following:
a. Require the pre-emergency curtailment of large energy use facilities subject to [removed: an approved] [added: directives from] PJM [removed: Interconnection, LLC “Connect and Manage” framework, or successor framework,] [added: to the Commission-regulated electric utility] in accordance with applicable PJM requirements.
90 words unchanged, in 4 paragraphs
b. Require the curtailment of non-critical large energy use facilities prior to the curtailment of other non-critical loads during a pre-emergency or emergency reliability event.
c. Require the curtailment of critical large energy use facilities prior to the curtailment of other critical loads during an emergency reliability event.
d. Include clear performance expectations and consequences for noncompliance.
e. Require a large energy use facility to inform potential customers that the facility is subject to curtailment under certain conditions and that, therefore, it may not be suitable for serving critical loads.
Legislative data from LegiScan, used under the Creative Commons Attribution 4.0 license and arranged by Dorworth News.