SENATE COMMITTEE SUBSTITUTE FOR

SENATE, No. 631

STATE OF NEW JERSEY

222nd LEGISLATURE

[removed: PRE-FILED FOR INTRODUCTION IN THE] [added: ADOPTED JUNE 8,] 2026 [removed: SESSION]

Sponsored by:

Senator BOB SMITH

District 17 (Middlesex and Somerset)

Senator LINDA R. GREENSTEIN

District 14 (Mercer and Middlesex)

Co-Sponsored by:

Senator Diegnan

SYNOPSIS

[removed: Establishes incentive program for installation of] [added: Requires BPU to establish distributed] energy storage [removed: systems.] [added: incentive program.]

CURRENT VERSION OF TEXT

[removed: Introduced Pending Technical Review] [added: Substitute as adopted] by [removed: Legislative Counsel.] [added: the Senate Environment and Energy Committee.]

An Act concerning energy storage [removed: systems] and supplementing Title 48 of the Revised Statutes.

Be It Enacted by the Senate and General Assembly of the State of New Jersey:

1. [removed: The Legislature finds and declares that:]

a. The electric grid is evolving from a system that relies on one-way, long-distance transmission of electricity from centralized power plants to customers to a system that includes local energy sources located close to customers, who increasingly both produce and consume electricity;

b. Energy storage systems, located throughout the electric grid, can facilitate greater energy independence and energy security for the State’s electric customers by providing increased stability of the power supply, smoother integration of renewable energy sources, a reduction in the peak demand placed on centralized power plants, and cost savings;

c. Locating energy sources and energy storage systems in high value locations, often near the point of consumption, enhances grid stability and increases efficiency;

d. Empowering New Jerseyans to take a more active role in the State’s electric grid would leverage private capital, protect customers from rising energy costs, and promote greater understanding and engagement with the challenges associated with updating the State’s electric grid;

e. Front-of-the-meter energy storage systems that are interconnected with the transmission and distribution system offer distinctive advantages, including, but not limited to, lower costs and responsiveness to price signals from the wholesale electricity market or electric public utility;

f. There are currently significant barriers that disincline New Jersey electric customers from obtaining the benefits of energy storage systems, including inadequate valuation of energy storage; and

g. It is fitting, proper, and in the public interest to encourage the installation of energy storage systems by providing monetary incentives to new energy storage systems and renewable energy sources paired with energy storage systems, and to compensate front-of-the-meter energy storage systems for their value to the grid, until these barriers are removed by market forces.

[removed: 2.] As used in [added: P.L. , c. (C. ) (pending before the Legislature as] this [removed: act:] [added: bill):]

[removed: “All-in system cost”] [added: “Accredited capacity”] means the [removed: total cost] [added: same as that term is defined in section 1] of [removed: purchasing and installing a new energy storage system, including the costs of hardware, siting, installation, permitting, and interconnection.] [added: P.L.2025, c.136 (C.48:3-121.2).]

“Board” means the [added: New Jersey] Board of Public [removed: Utilities.] [added: Utilities or any successor agency.]

“Critical community facility” means and includes, but is not limited to, any facility that has been formally identified by State or local offices of emergency management in a hazard mitigation plan or similar document as a critical community facility.

“Customer-sited energy storage system” means [removed: an] energy storage [removed: system] that operates in parallel with an electric distribution system, is connected on the customer side of the meter, and is owned by the customer or another party that is not the electric public utility that provides electric power to the customer.

“Electric public utility” means [removed: a public utility,] [added: the same] as [removed: that] [added: the] term is defined in [removed: R.S.48:2-13,] [added: section 3 of P.L.1999, c.23 (C.48:3-51).]

[added: “Energy storage” means the same as] that [removed: transmits and distributes electricity] [added: term is defined pursuant] to [removed: end users within the State.] [added: section 1 of P.L.2025, c.136 (C.48:3-121.2).]

“Energy storage [removed: system”] [added: capacity”] means [removed: a commercially available technology that is capable] [added: the measure] of [removed: absorbing energy, storing such energy for a period of time, and redelivering] the energy [removed: after it has been stored to provide direct] [added: capacity in kilowatt-hours] or [removed: indirect benefits to the broader electricity system, including, but not limited to, a battery system, pumped hydroelectric system, compressed air system, flywheel, or a hydrogen production, storage, or fuel cell system, provided that the hydrogen is produced through electrolysis using electricity from a renewable source.] [added: megawatt-hours of energy storage.]

“Front-of-the-meter energy storage system” means [removed: an] energy storage [removed: system] that is interconnected with the [removed: transmission and] distribution system on the utility side of the meter. “Front-of-the-meter energy [removed: storage system”] [added: storage”] shall include [removed: an] energy storage [removed: system] that is subject to a tariff from an electric public utility or from PJM.

[removed: “Gap analysis”] [added: “Incentive program”] means [added: the distributed energy storage incentive program established pursuant to section 2 of P.L. , c. (C. ) (pending before the Legislature as this bill).]

[added: “Installed capacity” means the nameplate output of] an [removed: analysis] [added: energy storage system, measured in kilowatts or megawatts of alternating current,] that [removed: determines the difference between the average all-in system costs of energy storage systems, considering each energy storage technology and application, and the prevailing revenue stream opportunities] [added: is available] to [removed: support] the [removed: economics of the energy storage systems.] [added: electric grid.]

“Overburdened community” means the same as the term is defined in section 2 of P.L.2020, c.92 (C.13:1D-158).

“Performance incentive” means a series of recurring monetary payments paid by an electric public utility to an owner of an energy storage system who participates in the pilot program to compensate for the benefits to the transmission and distribution system provided by the system.

“Pilot program” means the pilot program to incentivize the installation of new energy storage systems in the State developed by the board pursuant to section 3 of this act.

“PJM Interconnection, L.L.C.” or “PJM” means the same as the term is defined in section 3 of P.L.1999, c.23 (C.48:3-51).

[removed: “Transmission and distribution system”] [added: “Public utility”] means the same as [removed: the] [added: that] term is defined [removed: in section 3 of P.L.1999, c.23 (C.48:3-51).]

[removed: “Upfront incentive” means a one-time monetary payment from the board] [added: pursuant] to [removed: an owner of an energy storage system who participates in the pilot program to mitigate the upfront costs of the system.] [added: R.S.48:2-13.]

[removed: 3.] [added: 2.] a. [added: (1)] No later than [removed: 90 days after the effective date of this act, the board shall initiate a proceeding to develop a pilot program to incentivize the installation of new energy storage systems in the State. The pilot program shall include an upfront incentive as set forth in section 4 of this act and a performance incentive as set forth in section 5 of this act for owners of energy storage systems that are approved by the board to participate in the program. The provisions of the pilot program shall be based upon the best available data from similarly designed programs in other states.]

[removed: At the completion of the proceeding or] 180 days after the effective date of [added: P.L. , c. (C. ) (pending before the Legislature as] this [removed: act, whichever occurs sooner,] [added: bill),] the [removed: board] [added: Board of Public Utilities] shall [removed: issue] [added: establish, by order,] a [removed: board] [added: distributed energy storage incentive program to be administered by electric public utilities, which incentive program shall provide incentives for the development of at least 2,000 megawatts of installed capacity of customer-sited energy storage systems and front-of-the-meter energy storage systems by 2030. The] order establishing the [removed: pilot program. The order] [added: incentive program] shall [removed: include:] [added: specify minimum filing requirements for] the incentive [removed: amounts] [added: program, including, but not limited to:]

[added: (a) the incentive levels to be] established for customer-sited energy storage systems and front-of-the-meter energy storage systems [removed: pursuant] [added: connected] to [removed: sections 4 and 5] [added: the distribution system. However, the board may defer determination] of [added: incentive levels for front-of-the-meter energy storage systems until after an electric public utility files the tariffs required by section 3 of P.L. , c. (C. ) (pending before the Legislature as] this [removed: act;] [added: bill);]

[added: (b)] a methodology for determining [removed: compensation amounts] [added: the rates] for [added: the] tariffs filed [removed: for front-of-the-meter energy storage systems not subject to a tariff from PJM] [added: by an electric public utility] pursuant to section [removed: 6] [added: 3] of [added: P.L. , c. (C. ) (pending before the Legislature as] this [removed: act; and] [added: bill) for front-of-the-meter energy storage systems;]

[added: (c)] an application process for [removed: persons who wish to participate in] [added: applicants seeking an incentive through] the [removed: pilot] [added: incentive program; and]

[added: (d) eligibility requirements for applicants seeking an incentive through the incentive] program.

(2) In the first year of the incentive program, the board shall set goals to provide incentives for up to 350 megawatts in customer-sited energy storage systems and front-of-the-meter energy storage systems, with applicants accepted on a first-come, first-served basis. In general, the incentive program shall be designed to achieve or exceed, together with other energy storage programs established by the board through law, rule, regulation, or order, a total of incentives for new energy storage capacity equal to 3,000 megawatts by 2030.