New Jersey · S 631

New Jersey S 631: what changed from Introduced to Comm Sub


What changed in this version

[added: (3)] The [removed: upfront] [added: incentives provided through the] incentive [removed: amounts] [added: program] shall be [added: structured as an administratively-determined, fixed incentive paid on an annual basis for a period of 15 years, or another period as may be established by the board,] based on the [removed: nameplate] [added: energy] storage capacity of the energy storage system, as measured in [removed: kilowatt hours] [added: kilowatt-hours. The amount] of [removed: alternating current] [added: the incentive shall be expressed in dollars per rated kilowatt-hour of energy storage capacity per year. The board shall establish different incentive levels that distinguish between different projects sizes, whether the energy storage system is customer-sited or front-of-the-meter, and other criteria as established by the board. The total present value of an incentive provided through the incentive program over the 15-year incentive term, or other term as may be established by the board, shall not exceed 40 percent of a project’s total cost, based on a seven percent discount rate or other discount rate set by the board. The board may develop a system of incentive bonuses to differentiate between projects by attributes, including, but not limited to, those serving overburdened communities and those providing resilient] power [removed: output.] [added: to critical community facilities.]

b. Stand-alone energy storage systems or energy storage systems that are paired with a renewable source of electric power, including, but not limited to, a solar photovoltaic array, shall be eligible for the [added: incentive] program. However, the [removed: pilot] [added: incentive] program shall [added: only] be available [removed: only] to an energy storage system [removed: that:]

[removed: (1)] [added: that] becomes operable on or after the date [removed: of] [added: on which] the [removed: pilot program’s establishment;] [added: incentive program is established pursuant to subsection a. of this section] and

[removed: (2)] is either:

[removed: (a)] a customer-sited energy storage system that is owned, [added: hosted,] leased, or operated by a residential or non-residential customer of an electric public utility; or

[removed: (b)] a front-of-the-meter energy storage system located in the service area of an electric public [removed: utility.] [added: utility and connected to the distribution system.]

c. The board shall reserve at least one [removed: third] [added: quarter] of the [removed: upfront] incentives provided to customer-sited energy storage systems for customer classes or deployment scenarios that face greater economic hurdles, including, but not limited to, low-to-moderate income customers and customers [removed: sited] [added: located] in overburdened communities.

d. [removed: In the course of developing the pilot program, the board shall consider revising the eligibility requirement for net-metering for solar energy systems that requires that the capacity of the solar energy system be no greater than the annualized electricity usage of the facility to which the solar energy system supplies electricity, in order to accommodate the inclusion of energy storage system capacity, as well as the potential for future electric vehicle capacity.] The [removed: board shall include its recommendation in the report required by section 7 of this act.]

e. The pilot program shall be designed to achieve or exceed, together with other programs established by the board, the energy storage goals established by subsection d. of section 1 of P.L.2018, c.17 (C.48:3-87.8).

[removed: f. The] [added: incentive] program shall not prevent [added: or discourage customer-sited energy storage systems or front-of-the-meter] energy storage systems from providing services to, or participating in, the wholesale [removed: market.] [added: markets, particularly the PJM capacity market, unless such restrictions are temporarily needed to ensure the peak load reduction value of energy storage systems supported by the incentive program is reflected in PJM load forecasts prior to the first delivery year in which the energy storage systems can act as capacity suppliers.] Any evaluation of costs and benefits of [added: customer-sited energy storage systems or front-of-the-meter] energy storage systems shall include benefits that accrue directly or indirectly to ratepayers due to the participation of the [added: customer-sited] energy storage [removed: systems] [added: system or front-of-the-meter energy storage system] in wholesale markets.

g. The pilot program shall be closed immediately upon the adoption of the rules and regulations required pursuant to section 8 of this act.

[removed: 4. a. The pilot program shall include] [added: e. An applicant seeking] an [removed: upfront] incentive [removed: for] [added: award through] the [removed: owner of] [added: incentive program for] a customer-sited energy storage system [removed: or front-of-the-meter energy storage system, which] shall [removed: be based on] [added: complete] the [removed: installed capacity of the energy storage system and provided in dollars per kilowatt-hour and shall not exceed 40 percent of the project’s all-in cost. When determining the amount of the upfront incentive offered to an energy storage system, the board shall perform a gap analysis to ensure that the incentive to the owner incorporates consideration of the difference between available revenue streams, including any performance incentive offered under the pilot program, and the all-in system costs of the energy storage system. The board may develop a system of incentive bonuses to differentiate between projects] [added: project] by [removed: attributes, including, but not limited to, those serving low- and middle-income communities. After] [added: no later than 30 months after] the [removed: expiration of the pilot program, the board may reduce or eliminate the upfront incentive commensurate with a Statewide reduction in all-in system costs for energy storage systems or an increase in revenue streams available to owners of energy storage systems.]

[removed: b. The board shall establish qualifications and requirements an applicant shall be required to meet in order to be eligible for an upfront incentive pursuant to this section,] [added: date on] which [removed: may be more stringent than] the [removed: requirements of subsection b. of section 3 of this act.]

[removed: c. For energy storage systems with 25 kilowatts of nameplate storage capacity or greater, the board shall require the] [added: applicant’s application is approved. An] applicant [removed: for] [added: seeking] an [removed: upfront] incentive [removed: to pay to] [added: award through] the [removed: board] [added: incentive program for] a [removed: refundable deposit, which shall be refunded once the] [added: front-of-the-meter] energy storage system [removed: is determined by the board to be operable and in use. The board] shall [removed: develop a formula for calculating the deposit amount, in which the amount of the deposit is proportional to the nameplate capacity of the energy storage system.]

[removed: d. (1) The board shall require an applicant for an upfront incentive to] complete the [removed: energy storage project:]

[removed: (a) for customer-sited energy storage systems,] [added: project by] no later than [removed: 18] [added: 42] months after the date [added: on which] the [removed: board approves the] applicant’s [removed: application; and]

(b) for front-of-the-meter energy storage systems, no later than 40 months after the date the board approves the applicant’s application.

[removed: (2) An applicant that does not comply with the project timeline requirements of this subsection shall not be refunded the deposit paid to the board pursuant to subsection c. of this section. The deposit shall be transferred by the board to the General Fund. The board may waive or extend] [added: application is approved. However,] the project timeline requirements established by this subsection [added: may be waived or extended] for an applicant that demonstrates extenuating circumstances that caused a delay in the completion of the [removed: energy storage] project, [removed: including any] [added: including, but not limited to,] delays caused by an electric public [removed: utility] [added: utility, PJM, a permit authority,] or [removed: PJM.]

[removed: e. The board shall limit upfront incentives to one award per electric meter, for customer-sited energy storage systems.] [added: supply chain disruption.]

f. The [removed: board shall allocate at least $60 million per year, for the duration of the pilot program, from moneys collected from the societal benefits charge imposed pursuant to section 12 of P.L.1999, c.23 (C.48:3-60) to fund upfront incentives pursuant to this section. After the expiration of the pilot program, the board may determine the appropriate amount of funds to allocate to upfront incentives.]

5. a. The pilot program shall include a performance incentive to compensate the owner of a customer-sited energy storage system or front-of-the-meter energy storage system. The purpose of the performance payment shall be to:

(1) provide fair compensation for the full value of services provided by the energy storage system, including improving the efficiency of the transmission and distribution system and reducing the peak demand placed on electricity generators;

(2) increase the number of cost-effective energy storage systems that are connected to the transmission and distribution system;

(3) facilitate the integration of distributed sources of electricity generation; and

(4) increase the resilience of the transmission and distribution systems through the deployment of back-up power.

[removed: b. The board shall require each electric public utility in the State to offer an appropriate performance incentive, for a period to be determined by the] board, [removed: to an owner of an] [added: with input from stakeholders, shall establish minimum performance standards for customer-sited] energy storage [removed: system that participates in] [added: systems and a method for measuring and ensuring compliance with those standards for energy storage systems receiving an incentive through] the [added: incentive] program, which [removed: compensates for the operational attributes of the system, including,] [added: performance standards may include,] but [added: shall] not [added: be] limited to, [added: capability to increase distributed renewable energy hosting] capacity, [removed: demand response,] [added: congestion relief, capacity value or peak] load [removed: shifting, generation shifting, locational value, and] [added: reduction,] voltage [removed: support.] [added: control services such as Volt/Var control systems and Volt/Watt control systems, ramp rate control, and transmission and distribution infrastructure investment deferral or avoidance.] The [removed: costs] [added: performance standards may be autonomous or respond to signals from the local distribution utility.]

Legislative data from LegiScan, used under the Creative Commons Attribution 4.0 license and arranged by Dorworth News.